My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/08/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 12/08/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:11:01 PM
Creation date
12/8/2020 1:13:58 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
12/08/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
828
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
question will help gauge the readiness of the project. As a reminder, right of way acquisition costs are <br />not an eligible use for LRIP funds. <br />• No additional right of way is required <br />• Right of way has been acquired <br />• Right of way acquisition is underway <br />• Right of way acquisition has yet to begin <br />6. Ability to Operate and Maintain Facility. Describe the local agency's ability to adequately provide for the <br />safe operation and maintenance of the facility upon completion. <br />F. Multimodal/Complete Streets <br />Multimodal Improvements. Depending on where and how local roads are improved, vehicle traffic, multi - <br />modal, and non -motorized bike and pedestrian movements may benefit. Identify other users of the roadway <br />and describe multi-modal/non-motorized improvements included on the project. <br />G. Cost Section: <br />Provide estimated costs for construction from each potential funding source, including the amount of LRIP funds <br />requested. Cost estimates should be based on planning and engineering principles. All costs listed as coming <br />from agencies other than the applicant must be committed funds as reflected in a letter of support (agency has <br />agreed to provide these funds for the project). Do not include costs for studies, design, right of way acquisition, <br />construction engineering, or soft costs such as staff time. LRIP funds will be capped at $1,250,000 for counties, <br />state aid cities, non -state aid cities, and townships. Projects with total project cost estimates less than the <br />capped amount are not required to provide a match provided that all of the construction items are LRIP-eligible. <br />Items that are eligible for LRIP funds include reasonable elements associated with roadway construction, <br />including basic landscaping and turf establishment. Landscaping planters, benches, bike racks, decorative fences, <br />ornamental lighting, and other aesthetic treatments above the standard are generally not eligible. Other items <br />that are not eligible include engineering, construction administration and inspection, right of way acquisition, <br />and water main, sanitary sewer, or private utility work. Additionally, work on trunk highways or on trunk <br />highway right of way is typically not eligible. <br />H. Attachments: <br />The following attachments must be included with the application: <br />❑ At least one project location map with routes and project termini labeled <br />❑ Engineer's Estimate with an itemized breakdown <br />❑ Project schedule <br />❑ Local agency resolution <br />❑ Resolution of support from sponsoring county agreeing to be sponsor and agreeing to perform <br />sponsor tasks as identified above in section "Project Selection" (required for applications by <br />townships and cities under 5,000 population) <br />❑ Other letters of concurrence or support from MnDOT, other cities/counties that may benefit, <br />businesses, local legislators, and/or other benefiting parties. <br />http://www.dot.state.mn.us/stateaid/Irip.html 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.