My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/14/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 06/14/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:51:00 PM
Creation date
6/10/2005 2:31:16 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/14/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
571
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Traffic Operations Analysis <br /> <br />Analysis was completed for each of the NotBuiid scenarios for both the A.M. and P.M. <br />peak hours. Analysis was also completed for the Build sCenario, The analysis was <br />performed using the methodology of the 2000 Highway Capacity Manual through - <br />S'YNCHRO, a traffic mmlysis softWare program by Traffi~vare. Results. ofthe, analysis <br />are displayed as. measures of effectiveness. Measures of effectiveness display <br />quantitative information about the performance' o'f an ·intersection· Or network, of <br />intersections. The primary measttres that are usedin this·study are leve[ o£.setMce :and <br />delay. <br /> <br />Level of Service <br /> <br />The operational analysis re. suits are described as a Level. o f Service. (LOS) ranging from <br />A to F and these letters serve to describe a .range of operati~g eondi, tions:f0r different <br />types of facilities. Levels of Service are calculated based on the 200OHigh~,'aY:Capacity <br />Mammal, which defines the level of service, based on control delay:..For unsignalized <br />inters~ct/ons, control delay is the dday experienced by vehi¢iesstowlng dbwn fora stop <br />sign, the wait time at the stop sign,.and the time for the vehicle to speed up and move into <br />traffic. Level of service D is commonly taken as an acceptable desJ. gn year L©S. The <br />level of service and its associated intersect/on.delaY for a-stop-controlled intersection is <br />presented below. This level of service criteria is only relevant for stop. controlled <br />movemellt's. <br /> <br />Un-Signalized Intersection LOS: <br /> <br />LOS <br /> <br />A <br /> <br />C',On, trol~ Delay Per Vehicle. (seco <br /> <br />0,.10 <br /> <br />B >10-15 <br />C >15z25 <br />D · '>25-45 <br />E >3·5-50 <br />F >50. <br /> <br />Sweelbay Ridge Development EA W <br /> <br />page fl.~fl2 <br /> <br />Traj~c [rnpact Study <br />City of Ramsey, Anoka CounO; Minnesota <br /> <br /> Prepared by.: <br />Bolton c~ Menk; [nc <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.