Laserfiche WebLink
c. Indicate the number, location, size and use of any above or below ground tanks to <br /> store petroleum products or other materials, except water. Describe any emergency <br /> response containment plans. <br /> No above or below ground tanks will be located on site. However, small spills from the filling of equipment can <br /> occur. Hydraulic oil can be discharged onto the ground ifa hydraulic hose fails. Equipment will be parked in <br /> desigmated areas for fueling and during non-work hours. These areas will be in upland locations away from <br /> wetlands. Impoundment dikes will be constructed to contain fuels ifa spill should occur.. Soil, ifsignificandy <br /> contaminated, will bc removed from the site and taken to a licensed hazardous waste reclamation site. <br /> There will be no temporary tanks on site during construction. Refueling will take place from tanker trucks, and will <br /> occur in areas that are not environmentally sensitive. There will be no permanent storage tanks located on the site <br /> after development. <br /> <br />Provide an estimate of the impagt on traffic congestiOn..0_n affected roads and describe <br />any traffic improvements necessaw. If the project is within the Twin Cities metropol[~an <br />area, discuss its impact on the regional transpo~ation system. - <br />Parking spaces added N/A <br />Existing spaces (if project involves N/A <br />expansion) <br />Estimated total average daily traffic 2,430 trips <br />generated <br />Estimated maximum peak hour 260 ~ps <br />traffic generated (if known) <br />Time uf occurrence 4:30-5:30 PM Weekdays <br /> <br /> This residential development will incre~e ~affic on the s~o~ding roadways. A stop si~ will need to be placed <br /> at all development enhances that inte~ect with the su~ounding roadway network. No i~ediate improvements <br /> are needed on roadways aro~d the development ~ea. It h~ been noted ~at the inte~ection of 167m Avenue NW <br /> at TH 47 operates at a level ofse~ice below what is deemed accep~ble. By engineehng judgement, no <br /> improvemenB are needed at the inte~ection due ~ the facts that intemecfion volmes will not w~ant a siam ~d <br /> geomcthc improvements would be too ~eat to relieve a single ~affic movement. <br /> Plexse see a more in depth disc~sion of the ~affic issues included in the appen~x. <br /> <br />Estimate the effect of the project's traffic generation on air quality, including carbon <br />monoxide levels. Discuss the effect of traffic improvements or other mitigation measures <br />on air quality impacts. Note: If the project involves 500 or more parking spaces, consult <br />EAW Guidelines about whether a detailed air quality analysis is needed. <br /> The development of this proposed 253 mit single family residential subdivision <11, indeed, conMbute to the <br /> traffic volume gro~h on No.ben Boulev~d (CS~ 5) ~ presented in the previo~ section. The proposed <br /> subdivision will be consistent with the Ci~ of R~sey's Comprehensive Land Use Plan upon i~ proposed <br /> amendment, Fuahe~ore, the planning ~d desi~ of the subdivision provides good intersection ~acing, of t/4 <br /> mile or more, along No.hen Boulevard (CS~ 5), which should provide good ~affic management ~d operations. <br /> Thcretbre, the proposed Brookfield Addition subdivision is not anticipated m result in traffic congestion or <br /> si~milicant air quality impagB..' - . <br /> Carbon monoxide levels a~{e.d~je~ted to remain below ~he MPCA standard~ became the existing roadway system <br /> (along with planned improvemenB) appears'th have sufficient capacity to handle trips generated by the proposed <br /> development, Congestion is not expected on loca(or regional roMways and adverse air quality effecB do not <br /> appear likely. No air quali~ monitoring h~ been completed for the proposed project at this time ad no mitigation <br /> ~e~tlre8 are being proposed. <br /> <br /> <br />