My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/15/2020 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 12/15/2020 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:11:31 PM
Creation date
12/14/2020 2:54:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
12/15/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2016 COMPREHENSIVE SANITARY SEWER STUDY UPDATE <br />CITY OF RAMSEY, MINNESOTA <br />A. PURPOSE <br />The purpose for this report is to update the City's 2012 Comprehensive Sanitary Sewer Study <br />based on current population and land use projections. The 2012 Comprehensive Sanitary Sewer <br />Study included a plan for meeting the City' s infrastructure needs based on development projected <br />within the City's 2030 Comprehensive Plan. <br />City staff has identified development which has occurred since the 2012 study was completed and <br />has provided projections for development which is likely to occur in the next 24 years (Year <br />2040). This report evaluates the impact of the recent and projected development on the proposed <br />sanitary sewer infrastructure implementation. <br />The following paragraphs present a summary of key updates to the 2012 plan. The intent is to <br />complete the following: <br />• Estimate costs associated with infrastructure needed to serve future development areas, <br />• Provide estimations of growth and development anticipated through Year 2040, and <br />• Develop a connection amount based on the estimated costs and development. <br />B. SUMMARY OF INFRASTRUCTURE REVISIONS TO THE 2012 COMPREHENSIVE PLAN <br />Section 4 of the 2012 report describes the trunk infrastructure improvements needed to serve each <br />defined subdistrict within the MUSA boundary. For this report, each subdistrict was reviewed and <br />revisions were made to the required infrastructure based on: <br />• Improvements made over the last 4 years, and <br />• Considerations of improvements required. <br />Through discussions with the City, we were able to determine the improvements made within <br />each subdistrict over the last 4 years. We also made revisions based on anticipated development <br />patterns and anticipated future needs. The following paragraphs describe the revisions made <br />within each subdistrict to allow us to quantify the total improvement costs throughout the City. <br />We attached the updated 2016 "Proposed Trunk Sewer Extensions" map showing the subdistricts <br />and the proposed trunk sewer extensions. <br />1. Subdistrict M3 <br />This subdistrict is located in the Southwest corner of the City, south of Highway 10. The <br />primary sewer crossing of Trunk Highway 10 has been completed and was removed from <br />the figure and cost estimate. The Bower's Drive NW trunk sanitary sewer line has been <br />converted from a trunk facility to a lateral sewer line. This line was removed from the <br />2016 proposed trunk sewer extensions as it is now anticipated to serve the area as a <br />standard lateral line. All trunk line project costs have been updated to 2016 unit prices. <br />2. Subdistrict M4 <br />This subdistrict is located north of Highway 10 and west of Armstrong Boulevard. The <br />trunk sanitary sewer facilities have been modified to reflect the findings of the 2015 <br />City of Ramsey, Minnesota — R16.110056 Page 1 <br />2016 Comprehensive Sewer Plan Update Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.