Laserfiche WebLink
Future Business Park study that was completed for this area of the City. Lift station MLS- <br />5 was added to the improvements required for this subdistrict. All project costs have been <br />updated to 2016 unit prices. <br />3. Subdistricts R21 Through R25 <br />These subdistricts are located north of Trott Brook in the north central portion of the City. <br />No layout revisions to these trunk extensions were made. All trunk line project costs have <br />been updated to current 2016 unit prices. <br />4. System Extension for 167th Avenue Future MUSA Study Area <br />The Future MUSA Study Area identifies an area to better understand the feasibility of <br />extending a trunk sewer line to the 167th Avenue/Saint Francis Boulevard (TH 47) land <br />use node. Municipal Water service exists to the area, but Sanitary Sewer does not. The <br />City has a land use goal to revitalize this node and surrounding area, and the availability <br />of Sanitary Sewer is a major variable in future land use decisions. The MUSA boundary <br />does not currently include this area. Findings from this study area will be utilize to <br />influence the City's 2040 Comprehensive Plan Update and discussions with private <br />developers currently proposing certain land use scenarios. <br />C. TRUNK SANITARY SEWER SYSTEM COSTS <br />Attached are the updated cost estimates related to the above revisions, totaling <br />$8,432,995. These costs include 25% for indirect costs such as administration, <br />engineering, legal and financing. Additionally, we have included a 20% contingency for <br />unforeseen improvements which may be required during the study period, for a total cost <br />of $10,119,594 in 2016 dollars. <br />The City' s current Capital Improvement Plan was used to determine expenditures for the <br />years 2016 to 2020. For the years 2021 to 2040, the above described costs were spread <br />evenly over the 20 year period, while being inflated at a rate of 3% per year. <br />D. DEVELOPMENTAL IMPACT ON THE COMPREHENSIVE SANITARY SEWER STUDY <br />Actual and projected development within the City of Ramsey since the 2012 Comprehensive <br />Sanitary Sewer Study are summarized as follows: <br />• Actual Total Connections from 2012-2015 are as follows: <br />- 2012: 295 <br />- 2013: 164 <br />- 2014: 66 <br />- 2015: 258 <br />- Avg: 196 <br />• Projected development rates used in 2012 study (through 2030) were as follows: <br />- 260 Residential Units/Year (25% High Density) <br />- 25 Commercial/Industrial Acres/Year <br />• Projected development rates (through 2040) are anticipated to be as follows: <br />- 160 Residential Units/Year (50% High Density) <br />- 10 Commercial/Industrial Acres/Year <br />City of Ramsey, Minnesota — R16.110056 Page 2 <br />2016 Comprehensive Sewer Plan Update Prepared by Bolton & Menk, Inc. <br />