My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 12/15/2020 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 12/15/2020 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:11:31 PM
Creation date
12/14/2020 2:54:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
12/15/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
558
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The projected Residential development rate was lowered by 100 Units/Year (-3 8.5 %) and the <br />projected Commercial/Industrial development rate was lowered by 15 Acres/Year (-60%) while <br />the projected number of high density units increased from 40 Units/Year to 80 Units/Year <br />(+200%). <br />Based on these considerations, the Residential Equivalent Units (connections) is conservatively <br />estimated at 160 per year. <br />The 2016 sewer connection charge is $1,126 per residential unit and $3,391 per <br />commercial/industrial acre. <br />E. ANALYSIS <br />Many factors impact the actual fee required to sustain and expand the trunk sanitary sewer <br />facilities. We have included a more comprehensive spreadsheet analysis of the sanitary sewer <br />expenses and revenues. Assumption made in the spreadsheet are: <br />• Anticipated revenue from utility billings of $1,424,849 were used for 2016 and then inflated <br />at 1% per year. <br />• Trunk Connection charges and SAC fees were set at $1,126 and $2,485 for 2016 and then <br />inflated at 2.5% per year. <br />• Operating expenses were set at $1,044,170 for 2016 and then inflated at 3% per year. <br />• Capital expenditures for 2016 to 2020 were taken from the City' s current Capital <br />Improvement Plan. <br />• Capital expenditures for 2021 to 2040 was determined as described in Section 3 of this report. <br />The information provided in this report should be considered when setting sanitary sewer <br />connection charges within the City. <br />City of Ramsey, Minnesota — R16.110056 Page 3 <br />2016 Comprehensive Sewer Plan Update Prepared by Bolton & Menk, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.