My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:09:07 PM
Creation date
1/27/2021 11:46:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION: The City of Ramsey (City) is requesting proposals for the delivery of a <br />topographic survey along Tiger Street between Armstrong Boulevard and 173rd Avenue as shown <br />in the attached exhibit. Tiger Street is a 0.4 mile rural section street, typically 24-feet wide with a <br />30 mph speed limit. The scope of this work includes: <br />• Topographic Survey <br />• Contacting Gopher State One call to locate utility markings <br />• Delivery of survey points in an Excel/CSV format <br />• Point Code listing <br />FIELD SURVEY REQUIREMENTS: The field survey is not limited to, but is expected to <br />include the following: <br />• Elevations along the centerline, edge of bituminous pavement, edge of shoulder, ditch cross <br />section up to the right-of-way at 50-foot stations and grade changes. <br />• Elevations of intersecting streets along the centerline, edge of bituminous pavement and <br />ditch cross section, and/or gutter and top of curb and boulevard to the right-of-way, to the <br />distance specified in the exhibit. <br />• Location and elevations on driveway edges and corners to the right-of-way along with <br />driveway culverts. <br />• Location and elevations of trees/tree lines, landscaping, mailboxes, signage, fence lines, <br />utilities, etc. in the right-of-way. <br />• Location of pavement striping. <br />• Location and elevations of off-street bituminous trail. <br />• Location and elevations of any storm sewer structure and culverts. <br />SCHEDULE: A written schedule of the work shall be submitted identifying all work components <br />and showing work start and completion dates required to comply with the schedule. Once work <br />has commenced, the Contractor shall continuously pursue completion in accordance with the <br />approved schedule. The final Topographic Survey must be delivered to the City by Thursday, <br />December 31, 2020. <br />PROPOSAL SUBMITTAL: A lump sum quote shall be submitted for the proposed work using <br />the form at the end of this Request for Proposal (RFP). <br />COMMUNICATION WITH THE CITY: If any requirements of this RFP are not clearly <br />understood, the Contractor is responsible for contacting the City for further clarification in a <br />prompt manner. Responses to inquiries, if they change or clarify the RFP in a substantial manner, <br />will be forwarded by addenda to the RFP. <br />SUBMISSION: A signed copy of the attached proposal form is requested by 4:30 P.M. <br />Thursday, November 5, 2020. Deliver to the Ramsey Municipal Center, 7550 Sunwood Drive <br />NW, Ramsey MN 55303 to the attention of Marsha Weidner, Engineering Administrative <br />Assistant. E-mail quotes will be accepted and may be sent to MWeidner@cityoframsey.com. <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.