My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:09:07 PM
Creation date
1/27/2021 11:46:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSAL UNDERSTANDING: By submitting a proposal, the Contractor agrees to be bound <br />to the terms and conditions herein. <br />COSTS OF PREPARATION: Under no condition will any costs of preparation of the proposal <br />be reimbursed by the City. <br />LICENSE AND INSURANCE: By submitting a proposal, the Contractor affirms they shall <br />maintain the following minimum insurance coverage while completing their work as related to this <br />RFP in the following amounts: Commercial General Liability $1,000,000 per occurrence (written <br />on an occurrence based form bodily injury and property damage); automobile liability $1,000,000 <br />per occurrence (including hired & non -owned bodily injury and property damage). The City of <br />Ramsey shall be named as an additional insured on the Commercial General Liability insurance. <br />Certificates of Insurance for all of the above insurance shall be filed with the City prior to the <br />work. The Contractor also affirms they shall be licensed to perform the work in the State of <br />Minnesota, and the work shall comply with all state and local laws. <br />WORKING HOURS: The work shall be carried out during normal working hours so as not to <br />cause any unreasonable nuisance to affected residents and businesses. Under emergency <br />conditions, this limitation may be waived in writing by the Engineer in conjunction with qualified <br />local authority. Normal working hours for this work are considered to be from 7:00 a.m. to 10:00 <br />p.m., Monday through Friday. <br />WORK AND STAGING AREAS: The Contractor shall confine their work activities within City <br />owned properties and right of way. No equipment shall be left on City streets outside normal <br />working hours. <br />TRAFFIC CONTROL: Work shall be conducted in conformance with the specifications set forth <br />herein and in accordance with the Minnesota Department of Transportation Standard <br />Specifications for Construction, 2018 Edition, which is incorporated by reference to these <br />specifications. <br />PAYMENT: Payment will be made upon submittal of an invoice to the City on a net 30 day basis <br />following City acceptance of the work. An IC 134 form will be required prior to final payment. <br />BASIS OF PAYMENT: Payment shall be made on a lump sum basis for all components of the <br />work as specified in the RFP. The cost of any additional equipment, labor, materials, permits, tools <br />and supplies which have not been specifically identified in this section for payment, but are <br />required to complete the work, shall be considered incidental to the project. The City is also <br />requesting an hourly rate for additional survey work to be submitted, if we find a need to expand <br />the project scope after reviewing the initial survey. <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.