My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:09:07 PM
Creation date
1/27/2021 11:46:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1044547 <br />other issues related to contaminated materials found on State Right -of -Way or import of materials <br />onto State Right -of -Way. <br />C. Environmental Consultant. The County will provide for an Environmental Consultant to be on site to <br />observe and document the excavation, handling and disposal of contaminated soils that have been <br />identified within the Project limits. If the contractor encounters contaminated materials in areas not <br />previously identified and upon notification by the County to the State, the County hired Environmental <br />Consultant will be provided to collect and analyze soil and/or groundwater samples to determine <br />contaminant levels, work with the landfill for disposal of the soil waste, and provide oversight of any <br />soil and groundwater handling and disposal. The County will not allow the contractor to excavate any <br />contaminated soil unless the Environmental Consultant is present. <br />3.8. Completion of Construction. The County will cause the contract construction to be started and completed <br />according to the time schedule in the construction contract special provisions. The completion date for the <br />contract construction may be extended, by an exchange of letters between the appropriate County official <br />and the State District Engineer's authorized representative, for unavoidable delays encountered in the <br />performance of the contract construction. <br />3.9. Plan Changes. All changes in the Project Plans and all addenda, change orders, supplemental agreements, <br />and work orders entered into by the County and its contractor for contract construction must be approved <br />in writing by the State District Engineer's authorized representative. <br />3.10. Compliance with Laws, Ordinances, and Regulations. The County will comply and cause its contractor to <br />comply with all Federal, State, and Local laws, and all applicable ordinances and regulations. With respect <br />only to that portion of work performed on the State's Trunk Highway Right -of -Way, the County will not <br />require the contractor to follow local ordinances or to obtain local permits. <br />3.11. Construction Documents Furnished by the County. The County will keep records and accounts that enable <br />it to provide the State, when requested, with the following: <br />A. Copies of the County contractor's invoice(s) covering all contract construction. <br />B. Copies of the endorsed and canceled County warrant(s) or check(s) paying for final contract <br />construction, or computer documentation of the warrant(s) issued, certified by an appropriate County <br />official that final construction contract payment has been made. <br />C. Copies of all construction contract change orders, supplemental agreements, and work orders. <br />D. A certification form, provided by the State, signed by the County's Engineer in charge of the contract <br />construction attesting to the following: <br />i. Satisfactory performance and completion of all contract construction according to the Project <br />Plans. <br />ii. Acceptance and approval of all materials furnished for the contract construction relative to <br />compliance of those materials to the State's current "Standard Specifications for Construction". <br />iii. Full payment by the County to its contractor for all contract construction. <br />E. Copies, certified by the County's Engineer, of material sampling reports and of material testing results <br />for the materials furnished for the contract construction. <br />F. A copy of the "as built" plan sent to the State Aid Agreements Engineer. <br />-4- <br />Payable Lump Sum on Low Bid (Cooperative Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.