My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/10/2020
Ramsey
>
Public
>
Agendas
>
Council
>
2020
>
Agenda - Council - 11/10/2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 2:09:07 PM
Creation date
1/27/2021 11:46:07 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/10/2020
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MnDOT Contract No.: 1044547 <br />4. Right -of -Way; Easements; Permits <br />4.1. The County will obtain all rights -of -way, easements, construction permits, and any other permits and <br />sanctions that may be required in connection with the local and trunk highway portions of the contract <br />construction. Before payment by the State, the County will furnish the State with certified copies of the <br />documents for rights -of -way and easements, construction permits, and other permits and sanctions <br />required for State participation construction covered under this Agreement. <br />4.2. The County will convey to the State by quit claim deed, all newly acquired rights needed for the continuing <br />operation and maintenance of the Trunk Highway, if any, upon completion of the Project, at no cost or <br />expense to the State. <br />4.3. The County will comply with Minnesota Statutes § 216D.04, subdivision 1(a), for identification, notification, <br />design meetings, and depiction of utilities affected by the contract construction. <br />4.4. The City will submit, and the County will require the City of Anoka to submit to the State's Utility Engineer <br />an original permit application for all utilities owned by the City of Anoka and the City (of Ramsey) to be <br />constructed upon and within the Trunk Highway Right -of -Way. Applications for permits will be made on <br />State form "Application for Utility Permit on Trunk Highway Right -of -Way" (Form 2525). <br />4.5. Limited Use Permit. The County will obtain, through the District's Right -of -Way Area Manager, a Limited <br />Use Permit to cover the County's liability responsibilities of the non -motorized trail to be constructed upon <br />the State's Right -of -Way. <br />5. Maintenance by the County <br />Upon completion of the Project, the County will provide the following without cost or expense to the State: <br />5.1. Storm Sewers. Routine maintenance of any storm sewer facilities construction as shown on the "Drainage <br />Maintenance Exhibit". Routine maintenance includes, but is not limited to, removal of sediment, debris, <br />vegetation and ice from grates and catch basins, and any other maintenance activities necessary to <br />preserve the facilities and to prevent conditions such as flooding, erosion, or sedimentation, this also <br />includes informing the District Maintenance Engineer of any needed repairs. <br />5.2. Trail. Maintenance of any trail construction. Maintenance includes, but is not limited to, snow and ice <br />control/removal, sweeping and debris removal, patching, crack repair, pavement replacement, vegetation <br />control, signing, pavement markings, and any other maintenance activities necessary to perpetuate the <br />trail in a safe and usable condition. The Limited Use Permit, currently L.U.P. No. 0206-0093, will further <br />address trail maintenance and liability responsibilities. <br />5.3. Additional Drainage. No party to this Agreement will drain any additional drainage volume into the storm <br />sewer facilities constructed under the construction contract that was not included in the drainage for <br />which the storm sewer facilities were designed, without first obtaining written permission to do so from <br />the other party. The drainage areas served by the storm sewer facilities constructed under the <br />construction contract are shown in a drainage area map. <br />6. Signal System and EVP System Operation and Maintenance <br />Operation and maintenance responsibilities will be as follows for the Signal System and EVP System on T.H. 47 <br />(St. Francis Boulevard Northwest) at C.S.A.H. 116 (Bunker Lake Boulevard). <br />-5- <br />Payable Lump Sum on Low Bid (Cooperative Agreements) <br />
The URL can be used to link to this page
Your browser does not support the video tag.