My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 02/08/2021
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2021
>
Agenda - Council Work Session - 02/08/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:52:01 PM
Creation date
2/5/2021 11:21:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
02/08/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
323
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10.3 <br />10.3.1 <br />Table 10-2 — Public Works Site Costs <br />Est. <br />Quantity <br />Unit Pric <br />24" Raw Watermain <br />LF <br />5,900 <br />$250 <br />$1,475,000 <br />24" Road Crossing <br />(Jacking) <br />LF <br />200 <br />$1,000 <br />$200,000 <br />24" Finished <br />Watermain <br />LF <br />3,800 <br />$250 <br />$950,000 <br />20" Raw Watermain <br />LF <br />1,900 <br />$175 <br />$333,000 <br />Well 8 Meter Vault <br />Lump Sum <br />1 <br />$100,000 <br />$100,000 <br />Total <br />$3,058,000 <br />1 Costs are for comparison of alternatives and are not meant to represent the full project costs. <br />Water Shop Site, <br />The Water Shop Site for the water treatment plant is City -owned property on the west side of <br />Jasper Street, across the street from the new Public Works Facility. The water treatment plant <br />would require approximately 3.5 acres of land. The current City water operations shop is located <br />on this site. Construction of the water treatment plant on the Water Shop Site would require <br />demolition of the existing water operations shop and abandonment of 142nd Ave NW. A water <br />treatment plant layout for the Water Shop Site is shown on Figure 6 in Appendix I. <br />Raw and Finished Watermain Costs — Water Shop Site <br />The raw and finished watermain required to construct a water treatment plant at the Water Shop <br />Site is shown on Figure 3 in Appendix I. The water main costs are included in Table 10-3. <br />Because a new Public Works building is being constructed across the street from the Water Shop <br />Site, it is assumed that a new garage is not needed with the water treatment plant. Costs to <br />demolish the existing water operations shop are not included in Table 10-3. <br />FEASIBILITY STUDY - DRAFT <br />Table 10-3 — Water Shop Site Costs <br />Est. <br />Quantity <br />Unit Pric: <br />Cost <br />nip <br />24" Raw Watermain <br />LF <br />7,200 <br />$250 <br />$1,800,000 <br />24" Road Crossing <br />(Jacking) <br />LF <br />200 <br />$1,000 <br />$200,000 <br />24" Finished <br />Watermain <br />LF <br />4,600 <br />$250 <br />$1,150,000 <br />20" Raw Watermain <br />LF <br />1,900 <br />$175 <br />$333,000 <br />Well 8 Meter Vault <br />Lump Sum <br />1 <br />$100,000 <br />$100,000 <br />Total <br />$3,583,000 <br />1 Costs are for comparison of alternatives and are not meant to represent the full project costs. <br />RAMSY 154354 <br />Page 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.