My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/16/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 02/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:32:15 AM
Creation date
2/12/2021 3:48:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 7. 1. <br />Meeting Date: 02/16/2021 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />Title: <br />Receive Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Requested by the Minnesota DNR <br />• Construction proposed 2021/2022 <br />• Variolite Street Reconstruction (#20-01) <br />• Construction substantially complete <br />• Punch list work required in the spring/summer of 2021 <br />• Final payment anticipated summer/fall 2021 <br />• Riverdale Drive Reconstruction — Feldspar St. to Tungsten St. (#21-00) <br />• Bids are advertised in the Anoka Union Herald and Finance & Commerce <br />• Construction proposed 2021 <br />• Removal of Dolomite Street north of Riverdale is also proposed for 2021 <br />• Municipal Well #1 Casing Evaluation (#21-01) <br />• MDH Grant agreement executed <br />• Work to be completed in 2021 <br />• Tiger Street Reconstruction (#21-02) <br />• Plans are being prepared in-house <br />• Construction proposed 2021 <br />• Business Park 95 Street Reconstructions (#21-03) <br />• Plans are being prepared in-house <br />• Construction proposed 2021 <br />• 2021 Neighborhood Pavement Overlay Improvements (#21-04) <br />• Plans are being prepared in-house <br />• Construction proposed 2021 <br />• 2021 MSA Pavement Overlay Improvements (#21-05) <br />• Plans are being prepared in-house <br />• Construction proposed 2021 <br />• 2021 Crack Seal Improvements (#21-06) <br />• Bids are advertised in the Anoka Union Herald and Finance & Commerce <br />• Construction proposed 2021 <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />
The URL can be used to link to this page
Your browser does not support the video tag.