My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 02/16/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 02/16/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:32:15 AM
Creation date
2/12/2021 3:48:37 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
02/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed 2022, pending City & County approvals <br />• CSAH 116 Interim Improvements <br />• Resolution #21-044 has been shared with Anoka County <br />• Layout modifications will be reviewed with the City Council <br />• Construction proposed 2021 pending City & County approvals <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Constructing additional turn lanes in 2021 to improve operations and safety <br />• Forest Lake Contracting was awarded the construction contract <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 - 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design still on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve, which would require the relocation <br />of Alter Recycling <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 - 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 - 2023 <br />• NW Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES funded 100% using Clean Water Funds <br />• Study to be presented at future meeting <br />• City of Ramsey Centralized Water Treatment Plant Feasibility Study <br />• Final draft of Feasibility Study complete <br />• City Council to consider authorizing SEH, Inc. to prepare plans and specifications for trunk watermain <br />improvements on February 23, 2021 <br />• City Council to consider authorizing solicitation of Requests for Proposals to qualified consultants on <br />February 23, 2021 <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary design for grade -separation of Ramsey Blvd. and Sunfish Lake Blvd. is underway <br />• Approximately $84M in project funding has been secured <br />• Remaining funding continues to be pursued <br />• Public Open House scheduled for February 18, 2021 <br />• NW Metro Mississippi River Crossing Feasibility Analysis <br />• No updates at this time <br />• TH 47 Safety Study <br />• No updates at this time <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Monitoring actions in other cities <br />Timeframe: <br />Staff estimates up to 10 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.