Laserfiche WebLink
A site review was conducted on 10/25/2019 with Ben Meyer (Minnesota Board of Water and Soil <br />Resources), Karen Wold (Barr Engineering for the LRRWMO), and Adam Cameron (Kjolhaug Environmental). <br />The wetland delineation report and a WCA Notice of Application were provided to TEP members on <br />10/30/2019. <br />The comment period ended on 11/21/2019 and no comments were received. <br />The no-wetland determination is accurate based on the requirements of the 1987 U.S. Army Corps of <br />Engineers (USACE) Wetland Delineation Manual, the 2010 Midwest Regional Supplement, and the 2015 <br />Guidance for Submittal of Delineation Reports to the USACE and WCA LGU in Minnesota, Version 2.0. <br />1 <br /> Findings must consider any TEP recommendations. <br />Attached Project Documents <br /> Site Location Map Project Plan(s)/Descriptions/Reports (specify): <br /> <br />Appeals of LGU Decisions <br />If you wish to appeal this decision, you must provide a written request within 30 calendar days of the date you <br />received the notice. All appeals must be submitted to the Board of Water and Soil Resources Executive Director <br />along with a check payable to BWSR for $500 unless the LGU has adopted a local appeal process as identified <br />below. The check must be sent by mail and the written request to appeal can be submitted by mail or e-mail. <br />The appeal should include a copy of this notice, name and contact information of appellant(s) and their <br />representatives (if applicable), a statement clarifying the intent to appeal and supporting information as to why <br />the decision is in error. Send to: <br /> <br />Appeals & Regulatory Compliance Coordinator <br />Minnesota Board of Water & Soils Resources <br />520 Lafayette Road North <br />St. Paul, MN 55155 <br />travis.germundson@state.mn.us <br /> <br />Does the LGU have a local appeal process applicable to this decision? <br />1 <br />Yes No <br />1 <br />If yes, all appeals must first be considered via the local appeals process. <br /> <br />Local Appeals Submittal Requirements (LGU must describe how to appeal, submittal requirements, fees, etc. as applicable) <br /> <br /> <br />Notice Distribution (include name) <br />Required on all notices: <br /> SWCD TEP Member: Becky Wozney BWSR TEP Member: Ben Meyer <br /> LGU TEP Member (if different than LGU contact): <br /> DNR Representative: Leslie Parris <br /> Watershed District or Watershed Mgmt. Org.: Todd Haas (LRRWMO), Bob Obermeyer (Barr Engineering Co.) <br />City Contact for LRRWMO permitting: Bruce Westby and Leonard Linton (City of Ramsey) <br /> Applicant (notice only): Steve Bona (Capstone Homes) Agent/Consultant (notice only): Melissa Barrett <br />(KjolhaugEnvironmental) <br /> <br />Optional or As Applicable: <br /> Corps of Engineers: <br />BWSR Wetland Mitigation Coordinator (required for bank plan applications only): <br />Members of the Public(notice only): Other: <br /> <br /> <br />BWSR NOD Form - October 2019 2 <br /> <br />