My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 01/25/2021
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2021
>
Agenda - Environmental Policy Board - 01/25/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 10:03:38 AM
Creation date
2/18/2021 4:22:34 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
01/25/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
785
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Riverstone SouthEAWDraft December 2020 <br />next to Riverdale Drive and the project will not affect the existing 50-foot wooded buffer behind <br />residential lots located southwest of the site. <br />Single-family lots will generally range from 40to 65feet wideandwill typically be at least 11 feet <br />deep.Most public streets are expected to be 29feet wide and located within 60-foot rights-of-ways. <br />Pearson Boulevard, which will be routed through the approximate center of the site, will be slightly <br />wider at 32 feet. A 60-foot-wide open grass strip will provide an informal and emergency access to <br />Bowers Drive, which is located 400 feet southwest of the site. The development will operate under a <br />Development of the project area will involve installation of public and private infrastructure, <br />including streets, municipal water and sanitary sewer, stormwater systems, electrical lines, and <br />telephone lines. The project area will be served by City of Ramseyfire and police servicesand by <br />the Anoka-HennepinSchoolDistrict. <br />It is anticipated that construction of the development will start inspring or summerof 2021 or 2022 <br />and bephased over 3 to 5 years, depending on market conditions. Construction will generally be <br />phased from the north to the south based on the extension of municipal water and sewer, which will <br />be extended withRiverdale Drive, to be constructed along the north edge of the site. The number of <br />phases will be determined by market demand and absorption. Infrastructure will be installed at the <br />initiation of each construction phase. In most cases, streets, watermain, and sanitary sewer will only <br />be installed to serve the upcoming phase of construction. It may be necessary to initiate stormwater <br />basin construction at the start of each construction phase toproperlytreat stormwater and minimize <br />potential effects ofstormwater runoff. <br />c.Project magnitude: <br />Table 1. Project Magnitude <br />CharacteristicNumber of Units <br />Total Project Acreage78.63 <br />Linear project lengthNA <br />165single-family detached <br />Number and type of residential units <br />78 detached townhomes <br />243 total detached units <br />Number and type of residential units0 <br />Commercial building area (square feet)0 <br />Industrial building area (square feet)0 <br />Institutional building area (square feet)0 <br />Other uses specify (acres)NA <br />Structure height(s) (feet)20-35 <br />3 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.