My WebLink
|
Help
|
About
|
Sign Out
Home
06/28/05
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Finance Committee
>
Agendas
>
2000's
>
2005
>
06/28/05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2025 3:51:45 PM
Creation date
6/24/2005 5:33:25 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Finance Committee
Document Date
06/28/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FC CASE # <br /> <br />AUTI'IORIZE CONTRACT FOR REPAIRS TO FIRE STATION No. 1 <br /> By: Dean Kapler, Fire Chief <br /> <br />I~ack~4round: <br /> <br />On February 21,2005 Fire Station #1 sustained damage from a Firefighters personal vehicle <br />while rcsponding to an incident. Repairs were delayed until the regular construction season to <br />avoid cold weather charges. <br /> <br />SlatT is recommending to enter into a contract with the S&P Construction of St. Paul, Inc. who <br />arc general contractors. The bidding process produced a base contract cost of $29,758.75. This <br />amount includes repair of all damage, inside and out. <br /> <br />StalT is also rccommcnding that the main front door be replaced during this process. The current <br />door can not be locked from the inside and still allow exiting without manually unlocking and re- <br />locking lhc door. A new door equipped with a panic bar will allow locking and also exiting <br />wilhout mannal "un Iockiug". The cost of this additional work including installation is $8119 if <br />done in conjunction with the rest of the repairs. <br /> <br />Stal'l' is working with the LMCIT to recover the costs of repairs from the Firefighters auto <br />insurance. <br /> <br />Fun(ling: <br /> <br />StalT rccommcnds fimding for the repairs to be taken from the cities insurance fund and the <br />replacement of the main door to be taken from the equipment replacement fund. <br /> <br />Staff Recommendation: <br /> <br />Ih~tcr inlo a contract with S&P Construction of St. Paul, Inc. in the amount of $37,877. <br /> <br />Finance Committee Action: <br /> <br />I~,ecommcnd adoption of Resolution No. 05-XX to Authorize Contract with S & P Construction <br /> St. Paul, Inc. Ibr Repairs to Fire Station No. 1. <br /> <br />Council Action: <br /> <br />Adopt o£ I>~csolution No. 05-XX to Authorize Contract with S & P Construction of St. Paul, Inc. <br />f~)r Repairs lo Fire Station No. 1. <br /> <br />Revie~ved By: <br />Asst. City Administrator <br />Finance Director <br />Fire Chief <br /> <br />FC: 06/28/2005 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.