Laserfiche WebLink
Bqqmjdbou!Sftqpotf <br />Vqebufe!Cz <br />Joe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe Feriancek <br />AMAMAMAMAMAM <br />Nbslvq!Ebuf <br />12/28/2020 11:42 12/28/2020 11:40 12/28/2020 11:39 12/28/2020 11:37 12/28/2020 11:34 12/28/2020 11:34 <br />Dibohfnbsl!Efubjmt <br />Individual site specific pedestrian ramp details are required for all proposed pedestrian ramps. Details must follow MnDOT Standard Plan requirements.City does not typically use drain <br /> tile behind the curb. Site soils are generally drainable, remove drain tile from the plans.Where is concrete pavement proposed?Site specific typical is required.Watermain along Road <br /> B (north) must be adjusted to get it out of boulevard area.Services must be shown from the main lines to the right of way. Need to call out stationing of wyes, and give invert information. <br /> Need to call out size, type, length, slope of service lines. <br />Dibohfnbsl!Tvckfdu <br />Ped Ramp DetailsSubsurface Edge Drain Behind CurbConcrete PavementTypicalWatmermain alignmentservices <br />Nbslvq!Obnf <br />JFJFJFJFJFJF <br />Gjmf <br />Sheet 29.pdfSheet 27.pdfSheet 26.pdfSheet 23.pdfSheet 10.pdfSheet 10.pdf <br />Tobqtipu <br />Efqbsunfou <br />Civil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer II <br />Tubuvt <br />UnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolved <br />Dpnqmfuf@ <br />FalseFalseFalseFalseFalseFalse <br />696867666364 <br />Sfg!$ <br />Project 20-135 Northfork Meadows Subdivision, Lennar12/03/2020 1:23 PM12/29/2020 09:16 AM <br />Dzdmf <br />1 <br />Hspvqjoh <br />Dibohfnbslt!Sfqpsu!Qspkfdu!Obnf;!Xpslgmpx!Tubsufe;!Sfqpsu!Hfofsbufe;! <br />Main Workflow <br /> <br />