Laserfiche WebLink
Bqqmjdbou!Sftqpotf <br />Vqebufe!Cz <br />Joe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe Feriancek <br />AMAMAMAMAMAMAM <br />Nbslvq!Ebuf <br />12/28/2020 11:34 12/28/2020 11:44 12/28/2020 10:22 12/28/2020 10:04 12/28/2020 10:07 12/28/2020 10:07 12/28/2020 10:07 <br />". Plastic pipe in <br />Dibohfnbsl!Efubjmt 12 <br />" Pipe is below minimum <br />All utilities must be shown in profile view.6acceptable pipe size. Minimum storm pipe size isgreen space is acceptable, last run of pipe going to street must be concrete.If plastice <br /> storm pipe is used, manholes must have a boot, this will need to be added as a note and to the detail.Good information to know, This sheet is not required to be included in the construction <br /> plan set.This Detail only be acceptable for green space inlets.If Alpine Drive is going to be used during construction, this needs to have a construction exit.Do not see the drainage <br /> arrows in the plan, please update.Plans are difficult to read, erosion control measures need to be highlighted. <br />Dibohfnbsl!Tvckfdu <br />utility profilesBackyard Storm SewerCoverage PlanSilt Fence Inlet ProtectionConstruction Exit - Alpine DriveDrainage ArrowsPlan Readability <br />Nbslvq!Obnf <br />JFJFJFJFJFJFJF <br />Gjmf <br />Sheet 10.pdfSheet 12.pdfSheet 11.pdfSheet 8.pdfSheet 7.pdfSheet 7.pdfSheet 7.pdf <br />Tobqtipu <br />Efqbsunfou <br />Civil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer II <br />Tubuvt <br />UnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolved <br />Dpnqmfuf@ <br />FalseFalseFalseFalseFalseFalseFalse <br />65706257585960 <br />Sfg!$ <br />Dzdmf <br />1 <br />Hspvqjoh <br />Dibohfnbslt!Sfqpsu! <br />Main Workflow <br /> <br />