Laserfiche WebLink
57 <br />2504.603 12" WATERMAIN DUCTILE IRON CLASS 52 <br />LF <br />37341 <br />$ <br />68.00 $ <br />227,188.00 <br />0 <br />$ <br />- <br />40 <br />$ <br />2,720.00 <br />58 <br />2504.603 12" WATERMAIN HDPE (DIRECTIONAL DRILLED) <br />LF <br />1,204 <br />$ <br />72.10 $ <br />861808.40 <br />0 <br />$ <br />1,204 <br />$ <br />86,808.40 <br />59 <br />2504.608 DUCTILE IRON FITTINGS <br />LBS <br />968 <br />$ <br />6.35 $ <br />6,146.80 <br />0 <br />$ <br />- <br />2,436 <br />$ <br />15,468.60 <br />60 <br />2506.502 CASTING ASSEMBLY (SANITARY) <br />EA <br />7 <br />$ <br />801,00 $ <br />5,607.00 <br />0 <br />$ <br />- <br />7 <br />$ <br />5,607.00 <br />61 <br />2506.502 ADJUST FRAME AND RING CASTING <br />EA <br />9 <br />$ <br />439,00 $ <br />33951.00 <br />0 <br />$ <br />- <br />9 <br />$ <br />3,951.00 <br />62 <br />2506.503 CONSTRUCT SANITARY STRUCTURE DESIGN 48-4007 <br />LF <br />98.3 <br />$ <br />306.00 $ <br />30,079.80 <br />0.0 <br />$ <br />- <br />98.0 <br />$ <br />29,988.00 <br />63 <br />2506.503 CONSTRUCT SANITARY STRUCTURE DESIGN 60-4007 <br />LF <br />23.9 <br />$ <br />747.00 $ <br />NX3.30 <br />0.0 <br />$ <br />- <br />24.4 <br />$ <br />181226.80 <br />64 <br />2506.602 RESET CATCH BASIN CASTING <br />EA <br />2 <br />$ <br />366.00 $ <br />732.00 <br />0 <br />$ <br />- <br />2 <br />$ <br />732.00 <br />65 <br />2506.603 CONSTRUCT 15" INSIDE DROP <br />LF <br />15.0 <br />$ <br />592.00 $ <br />8,880.00 <br />0.0 <br />$ <br />- <br />12,0 <br />$ <br />7,104.00 <br />66 <br />2521,518 6" CONCRETE WALK <br />SF <br />1,331 <br />$ <br />13.20 $ <br />1.7,569,20 <br />0 <br />$ <br />- <br />1,267 <br />$ <br />16,724.40 <br />67 <br />2531.503 CONCRETE CURB & GUTTER DESIGN B418 <br />LF <br />580 <br />$ <br />30.50 $ <br />17,690.00 <br />0. <br />$ <br />- <br />564 <br />$ <br />17,202.00 <br />68 <br />2531.504 6" CONCRETE DRIVEWAY PAVEMENT <br />SY <br />45 <br />$ <br />88.70 $ <br />3,991.50 <br />0 <br />$ <br />- <br />24 <br />$ <br />2,128.80 <br />69 <br />2531.504 CONCRETE MEDIAN <br />SY <br />10 <br />$ <br />72.00 $ <br />720.00 <br />0 <br />$ <br />11 <br />$ <br />792.00 <br />70 <br />2531,604 CONCRETE DRAINAGE FLUME <br />SY <br />5 <br />$ <br />135.00 $ <br />675.00 <br />0 <br />- <br />0 <br />$ <br />- <br />71 <br />2531.618 TRUNCATED DOMES <br />SF <br />206 <br />$ <br />60.00 $ <br />12,360.00 <br />0 <br />$ <br />- <br />200 <br />$ <br />12,000.00 <br />72 <br />2540.601 LANDSCAPE RESTORATION <br />LS <br />1 <br />$ <br />3,490.00 $ <br />3,490.00 <br />0 <br />$ <br />- <br />1 <br />$ <br />3,490,00 <br />73 <br />2540.602 TEMPORARY MAIL BOX CLUSTER <br />EA <br />4 <br />$ <br />250.00 $ <br />1,000.00 <br />1 <br />$ <br />250.00 <br />2 <br />$ <br />500.00 <br />74 <br />2540.602 INSTALL MAIL BOX SUPPORT <br />EA <br />12 <br />$ <br />75.00 $ <br />900.00 <br />11 <br />$ <br />825.00 <br />11 <br />$ <br />825.00 <br />75 <br />2563.601 TRAFFIC CONTROL <br />LS <br />1 <br />$ <br />5,800.00 $ <br />5,800.00 <br />0.1 <br />$ <br />580.00 <br />1 <br />$ <br />5,800.00 <br />76 <br />2573.502 STORM DRAIN INLET PROTECTION <br />EA <br />5 <br />$ <br />197.00 $ <br />985.00 <br />0 <br />$ <br />- <br />4 <br />$ <br />788.00 <br />77 <br />2573.503 SILT FENCE, TYPE MS <br />LF <br />13,255 <br />$ <br />1.80 $ <br />23,859.00 <br />1,327 <br />$ <br />211388.60 <br />9,162 <br />$ <br />16,491,60 <br />78 <br />2573.503 SEDIMENT CONTROL LOG TYPE STRAW <br />LF <br />1,795.0 <br />$ <br />2.40 $ <br />4,308.00 <br />0 <br />$ <br />- <br />600 <br />$ <br />1,440.00 <br />79 <br />2574.507 TOPSOIL (LV) <br />CY <br />1,992 <br />$ <br />33.70 $ <br />67,130.40 <br />0 <br />$ <br />- <br />1,700 <br />$ <br />57,290.00 <br />80 <br />2574.508 FERTILIZER TYPE 3 <br />LBS <br />555 <br />$ <br />0.53 $ <br />294,15 <br />0 <br />$ <br />- <br />345 <br />$ <br />182.95 <br />81 <br />2575.504 SODDING TYPE LAWN <br />SY <br />100 <br />$ <br />8.25 $ <br />825.00 <br />0 <br />$ <br />- <br />0 <br />$ <br />- <br />82 <br />2575.505 SEEDING <br />ACRE <br />5.45 <br />$ <br />475.00 $ <br />2,588.75 <br />0.00 <br />$ <br />- <br />3.45 <br />$ <br />1,638.75 <br />83 <br />2575.508 SEED MIXTURE 25-151 <br />LBS <br />665 <br />$ <br />3.10 $ <br />2,061.50 <br />0 <br />$ <br />- <br />414 <br />$ <br />1,283.40 <br />84 <br />2575.508 HYDRAULIC MUCLH MATRIX <br />LBS <br />21,800 <br />$ <br />0.69 $ <br />15,042.00 <br />0 <br />$ <br />- <br />13,800 <br />$ <br />9,522.00 <br />85 <br />2582.503 24" SOLID LINE PAINT (EPDXY) <br />LF <br />142 <br />$ <br />7.00 $ <br />994.00 <br />0 <br />$ <br />- <br />67 <br />$ <br />469.00 <br />86 <br />2582.503 4" DOUBLE SOLID LINE PAINT (EPDXY) <br />LF <br />2,825 <br />$ <br />0.44 $ <br />1,243.00 <br />0 <br />$ <br />- <br />211827 <br />$ <br />1,243.88 <br />87 <br />2582.503 4" SOLID LINE PAINT (EPDXY) <br />LF <br />27,935 <br />$ <br />0.22 $ <br />6,145.70 <br />305 <br />$ <br />67.10 <br />28,255 <br />$ <br />6,216.10 <br />88 <br />2582.503 4" BROKEN LINE PAINT (EPDXY) <br />LF <br />1,860 <br />$ <br />0.22 $ <br />409.20 <br />0 <br />$ <br />- <br />2,530 <br />$ <br />556.60 <br />89 <br />2582.503 4" DOTTED LINE PAINT (EPDXY) <br />LF <br />300 <br />$ <br />0.22 $ <br />66.00 <br />0 <br />$ <br />- <br />0 <br />$ <br />- <br />90 <br />2582.518 CROSSWALK PAINT (EPDXY) <br />SF <br />408.00 <br />$ <br />5.00 $ <br />2,040.00 <br />0 <br />$ <br />- <br />504 <br />$ <br />2,520.00 <br />91 <br />2582.518 PAVEMENT MESSAGE PAINT (EPDXY) <br />SF <br />124 <br />$ <br />6.43 $ <br />797.32 <br />0 <br />$ <br />- <br />125 <br />$ <br />803,75 <br />TOTALBED1 $ 2,813,756.09 <br />S <br />19,460.70 <br />$ <br />2,379,I67.89 <br />ALTERNATE A <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Item <br />No. <br />MnDot <br />No. <br />Item Description <br />Unit <br />Estimated <br />Unit Price <br />Extension <br />Quantity <br />Q ty <br />Extension <br />Quantity <br />Extension <br />uantit <br />Al <br />2565.616 <br />1PEDESTRIANCROSSWALK FLASHER SYSTEM <br />SYS <br />1 <br />$ 40,200.00 <br />$ 40,200.00 <br />0.0 <br />$ - <br />1 <br />$ 40,200.00 <br />TOTAL BID <br />$ 40,200.00 <br />$ -r <br />$ 40 200.00 <br />ALTERNATIVE B <br />Item <br />No. <br />MnDot <br />No. <br />Item Description <br />Unit <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Estimated <br />Quantity <br />Unit Price <br />Extension <br />Quantity <br />Extension <br />Quantity <br />Extension <br />B 1 <br />2504.603 <br />12" WATERMAIN DUCTILE IRON CLASS 52 <br />LF <br />-3,341 <br />$ 68.00 <br />$ (227,188.00) <br />0 <br />$ - <br />.0 <br />$ <br />B2 <br />2504.603 <br />12" WATERMAIN HDPE (DIRECTIONAL DRILLED) <br />LF <br />3,341 <br />$ 55.40 <br />$ 185,091.40 <br />0 <br />$ - <br />3,298 <br />$ 182,709.20 <br />TOTAL BID <br />$ 42,096.60 <br />$ - <br />$ 182,709.20 <br />CHANGE ORDER No.l <br />Item <br />No. <br />MnDot <br />No. <br />Item Description <br />Unit <br />CONTRACT AMOUNT <br />PAY THIS PERIOD <br />PAID TO DATE <br />Estimated <br />Price <br />Extension <br />Quantity <br />Extension <br />Quantity <br />Extension <br />18 <br />2105.601 <br />ADDITIONAL DEWATERING <br />LS <br />-QuantityUnit <br />1 <br />$ 11,985.00 <br />$ 11,985.00 <br />0 <br />$ - <br />1 <br />$ 11,985.00 <br />42 <br />2503.503 <br />21" PVC PIPE SEWER (SDR 26) <br />LF <br />160 <br />$ 88.70 <br />$ 14,192,00 <br />u <br />$ - <br />177 <br />$ 15,699.90 <br />92 <br />2503.503 <br />4" PVC SANITARY SEWER SERVICE PIPE (SDR 26) <br />LF <br />58 <br />$ 42.00 <br />$ 2,436.00 <br />0 <br />$ - <br />55 <br />$ 2,310.00 <br />93 <br />2503.602 <br />2 1 " X 4" PVC WYE (SDR 26) <br />EA <br />1 <br />$ 2,292.00 <br />$ 2,292.00 <br />0 <br />$ - <br />1 <br />$ 2,292.00 <br />94 <br />2503.602 <br />4" PVC CAP <br />EA <br />1 <br />$ 50.00 <br />$ 50.00 <br />0 <br />$ - <br />1 <br />$ 50.00 <br />46 <br />2503.603 <br />CLEAN AND VIDEO TAPE PIPE SEWER (SANITARY) <br />LF <br />160 <br />$ 1.40 <br />$ 224.00 <br />0 <br />$ - <br />117 <br />$ 163.80 <br />95 <br />2504.602 <br />1" CORPORATION STOP <br />EA <br />1 <br />$ 787.00 <br />$ 787.00 <br />0 <br />$ - <br />1 <br />$ 787,00 <br />96 <br />2504.602 <br />1" CURB STOP AND BOX <br />EA <br />1 <br />$ 768.00 <br />$ 768.00 <br />0 <br />$ - <br />1 <br />$ 768.00 <br />97 <br />2504.603 <br />1" COPPER PIPE TYPE K <br />LF <br />75 <br />$ 43.00 <br />$ 31225.00 <br />0 <br />$ <br />75 <br />$ 3,225.00 <br />60 <br />2506,502 <br />CASTING ASSEMBLY (SANITARY) <br />EA <br />1 <br />$ 801.00 <br />$ 801.00 <br />0 <br />$ - <br />1 <br />$ 801.00 <br />61 <br />2506.502 <br />ADJUST FRAME AND RING CASTING <br />EA <br />1 <br />$ 439.00 <br />$ 439.00 <br />0 <br />$ <br />1 <br />$ 439.00 <br />62 <br />2506.503 <br />CONSTRUCT SANITARY STRUCTURE DESIGN 48-4007 <br />LF <br />20.3 <br />$ 306.00 <br />$ 6,211.80 <br />0.0 <br />$ <br />19.9 <br />$ 6,089.40 <br />TOTAL BIDI <br />$ 43 410,80 <br />$ - <br />$ 44,610,10 <br />20-01 Variolite Street Reconstion Pay Estimate Page 3 of 3 <br />