Laserfiche WebLink
CC Regular Session <br />Meeting Date: 03/09/2021 <br />Submitted For: Bruce Westby, Engineering/Public Works <br />By: Joe Feriancek, Engineering/Public Works <br />Information <br />Title: <br />Adopt Resolution #21-056 Accepting Bids and Awarding Contract for 2021 Crack Seal Improvements, <br />Improvement Project #21-06 <br />7.4. <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to adopt Resolution #21-056 accepting bids and awarding a construction contract for <br />2021 Crack Seal Improvements, Improvement Project #21-06. <br />Background: <br />Crack seal improvements are completed annually on between 13 and 23 miles of public street segments to <br />cost-effectively maximize the life of the bituminous pavement. Crack sealing protects pavement by preventing <br />stormwater runoff from seeping through cracks in the pavement and joints between the pavement and concrete curb <br />and gutter and utility casting, reducing future pavement damage due to wet subgrade soils, especially during <br />freeze -thaw cycles. <br />The City's current pavement maintenance schedule calls for public streets to be crack sealed the third, seventh, and <br />fourteenth year following construction, reconstruction, and overlay improvements. However, while this is the <br />typical maintenance schedule it is important to note that Staff reviews the condition of all streets annually and <br />adjusts the schedule of maintenance operations based on actual pavement conditions. <br />A total of 20.88 miles of public street segments are proposed to receive crack seal improvements in 2021. These <br />street segments were selected based on age, pavement maintenance history, and Pavement and Surface Evaluation <br />Rating (PASER) values. Crack seal improvements are typically performed on a pavement section with PASER <br />values of 7 or higher. Staff also attempts to select street segments that are in relatively close proximity to each other <br />in an attempt to receive lower bid prices for mobilization and traffic control bid items. <br />Plans and specifications for the 2021 Crack Seal Improvements were prepared in-house as part of Staff's normal <br />duties. A copy of the plans are attached to this case. <br />Work is anticipated to occur between mid -June and mid -August. The work generally takes two to three weeks to <br />complete after the Contractor commits crews to the project. Staff is maintaining a project webpage, and updates it <br />as new information is available. Letters will not be mailed to notify the public of the 2021 Crack Seal <br />Improvements since the work occurs quickly and has little to no impact on the traveling public or abutting <br />properties. <br />Notification: <br />Bids were advertised in the Anoka Union Herald and in Finance and Commerce on January 29, 2021 and February <br />5, 2021. <br />Observations/Alternatives: <br />