My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/09/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 03/09/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:54:15 PM
Creation date
3/9/2021 3:59:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/09/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
529
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Bruce Westby <br />March 2, 2021 <br />Page 3 <br />EXHIBIT A <br />relocations. Additional time for coordination has been included in the proposal for potential coordination with <br />affected utilities. <br />Environmental Impacts <br />It is anticipated that wetland impacts will occur, and that permission to impact those wetlands will be required. <br />Permits will be required under the Wetland Conservation Act (WCA) and for Section 404 of the Clean Water <br />Act. The extent of permitting needed is dependent on the quantity of wetland impacts, but the preliminary <br />discussions indicate that impacts will be minor. It is assumed that impacts will require wetland mitigation. <br />To calculate wetland impacts and mitigation needs, SEH wetland scientists, led by Rebecca Beduhn, will <br />conduct an on -site investigation of wetland boundaries and habitat. It is assumed that the wetlands within the <br />project area are under the jurisdiction of City of Ramsey, Anoka County Soil and Water Conservation District, <br />and the United States Army Corps of Engineers (USACE). <br />Wetland delineations will be completed in accordance with USACE Engineers 1987 Manual and the Midwest <br />Regional Supplement. All areas meeting wetland criteria will be identified and flagged in the field. Wetland <br />boundaries will be mapped using a sub -meter accurate Global Positioning System. The location of the <br />wetlands will be provided in electronic format for inclusion in project plans. <br />SEH will prepare a wetland delineation report for review by the WCA LGU (City of Ramsey) and US Army <br />Corps of Engineers for their review and approval. SEH will facilitate any review of the wetland boundaries. <br />After completion of the wetland delineation, SEH will assist the project proposers with determining the project <br />purpose and need and with the sequencing process for the permitting process. Sequencing is the requirement <br />to identify opportunities to reduce impacts through alternatives analysis, avoidance, and minimization. Once <br />these exercises have been completed, a Wetland Permit Application will be prepared. This application will <br />identify the project, define the purpose and need, summarize sequencing and provide a wetland replacement <br />plan. Signatures will be required from the project proposer responsible for compliance with the permit <br />conditions. SEH will act as agent to allow representation in the process. <br />Preliminary Water Main Design & Value Engineering <br />It is important to note that the design of the water main is greatly dependent on existing utility locations and <br />available right-of-way and/or easements. Our team will identify a design approach that best serves the City <br />and its relations with Anoka County Highway Department. The design of the water main is anticipated to be a <br />combination of open -cut installation and trenchless installation to limit impacts to Bunker Lake Boulevard and <br />existing in -place utilities. Our team will analyze the costs of such proposed installations to determine which <br />methods are the best economical and practical approach. <br />Task 2: Final Design & Bid Documents <br />Final Design <br />After the preliminary layout of the proposed water main is complete, Justin will lead the team into final design <br />of the proposed improvements to meet the deadline of bidding this project in July 2021. The chosen <br />installation approach of the water main will be designed to meet the AWWA, MDH and City of Ramsey <br />standards. This will include design of impacted infrastructure such as trails, pedestrian ramps, driveways, <br />storm sewer, sanitary sewer, curbing and miscellaneous restoration items. <br />Bidding Documents & Bidding <br />SEH will prepare the project specifications and bidding package, and the project can be advertised once City <br />Council approval of the plans has been completed. SEH's project manager and technical experts will be <br />available throughout the bidding process for questions. We will attend the bid opening and analyze the bids in <br />order to give a contract award recommendation to the City. <br />SEH will provide all project base files to the City in AutoCAD Civil 3D as well as all digital plan sheets. <br />