Laserfiche WebLink
EXHIBIT A <br />Prepared by: Justin R. Bergerson <br />Central WTP Water Systems Connection <br />City of Ramsey, MN <br />SEH Project # P -159310 <br />March 2, 2021 <br />CO <br />CO <br />01 <br />CO <br />W <br />N r <br />r LO <br />O CO <br />r M <br />N CO <br />N <br />Cr CO <br />cf. 00 <br />CO <br />r <br />Cr Cr <br />r r <br />00 <br />r <br />CO 00 <br />r r <br />CO 00 <br />N <br />05 <br />N <br />N <br />N C <br />C iOC) 1 <br />t� <br />d <br />H <br />C <br />.1 <br />:I: <br />a <br />L <br />Li <br />U � <br />L <br />�U <br />z <br />N <br />4 <br />co <br />M <br />,- <br />00 <br />00 <br />00 <br />N <br />.• <br />CO <br />N <br />W <br />L <br />O <br />N <br />• <br />•• <br />ill <br />00 <br />, <br />N <br />00 <br />N <br />CD <br />N <br />N CO <br />00 <br />CO 00 <br />CO <br />CO <br />Or <br />N <br />N,— <br />N <br />N <br />0 0 <br />- <br />N <br />7, <br />N <br />N <br />co O <br />O <br />C.1 <br />O <br />N <br />00 <br />N <br />00 <br />Reduce survey data into base map (Create CAD BA file) <br />Incorporate available data info into base map (Utility Maps, Data <br />Collection information, etc.) <br />Develop project existing surface model <br />Water Main Design <br />Preliminary layout of water main <br />Develop suggested staging plan <br />Evaluate methods of installation - open cut vs. trenchless <br />Evaluate impacts to existing City and County utilities <br />Create pipe profile/pressure pipe network <br />Construction Limits, Removals & Restoration <br />Develop construction limits <br />Evaluate impacts and removals <br />Coordinate removal limits with Anoka County Project <br />Observe drainage patterns <br />V <br />112 <br />Review street closure/detour impacts <br />Detour Plan <br />Traffic Control Design <br />Cost Estimating <br />30% Cost Estimate (preliminary form) <br />60% Cost Estimate (based on quantity take off & bid items) <br />90% Cost Estimate <br />Design Meetings <br />Coordination meeting with Anoka County public works (2 <br />meetings) <br />Exhibits (permits, client requests, meetings) <br />Design review meetings (30%, 60%, 90% milestones) <br />Internal design team meetings (Bi-weekly) <br />City Council meetings (2 meetings) <br />i <br />I <br />p <br />� <br />m <br />