Laserfiche WebLink
m <br />X <br />w <br />Prepared by: Justin R. Bergerson <br />Central WTP Water Systems Connection <br />City of Ramsey, MN <br />SEH Project # P -159310 <br />March 2, 2021 <br />CO <br />N . <br />r r <br />O N <br />r r <br />N <br />N N <br />O <br />r <br />r <br />N <br />N <br />d` <br />M <br />O <br />O' <br />O g <br />r N <br />O 4 <br />O N <br />N <br />o0 <br />r r <br />t0 <br />r <br />O <br />M <br />r' <br />N <br />O <br />0 <br />� <br />r <br />t0 <br />co <br />C N <br />N <br />N C <br />C iOV 1 <br />$ 28,500.00 <br />t� <br />d <br />H <br />C <br />.E <br />.a <br />a <br />N <br />C% 3 <br />U <br />z <br />N <br />N, <br />N CV <br />N CO <br />N <br />N a0 <br />v, <br />N <br />' <br />O <br />R <br />O O' <br />el- <br />,,L. , <br />N <br />• <br />W <br />a <br />• <br />rre'M <br />• <br />4 <br />O M <br />(� <br />d` <br />N <br />T <br />O <br />T <br />oo <br />LEI <br />r <br />co <br />Tlald <br />. <br />TO:LjON <br />N <br />O <br />N O <br />O <br />o <br />t0 <br />O N <br />r- <br />co <br />N N, <br />N <br />co O <br />O <br />N <br />co <br />v <br />gg <br />it gg <br />c,,3 <br />N <br />f�, <br />vO <br />a,dk <br />a0 <br />.- <br />a <br />00 <br />M N <br />N <br />coCMO <br />6 <br />CV <br />N <br />N <br />N <br />O <br />r <br />.1 <br />ti <br />N <br />N <br />Prepare geotechnical scope of work. <br />Geotechnical Investigation by others (SEH to coordinate) <br />Review project with geotechnical staff <br />Coordinate geotechnical testing and boring location staking <br />($28,500 allowance for soil boring subcontractor) <br />Assess existing soils conditions <br />Develop trench excavation and backfill recommendations <br />Develop trenchless utility installation recommendations <br />Prepare draft geotechnical memo <br />Prepare final geotechnical memo <br />1d <br />2 1 <br />Rf Rf <br />O O= <br />Vi <br />c <br />E <br />E <br />N <br />i u3 <br />O N: <br />I <br />Y Y' <br />dr+ <br />C <br />E <br />Ps <br />ci <br />m <br />0 <br />t <br />O <br />Develop Construction Plan <br />Title Sheet <br />General Layout <br />Estimated Quantities, Notes, Standard Plates <br />General Notes <br />Tabulations <br />Construction details <br />Sequence of Operations/Phasing <br />Alignment Tabulation and Survey Control <br />Existing Conditions/Removals <br />Plan and Profile Sheets - Water Main <br />Plan and Profile Sheets - Grading/Street/ Trail <br />Storm Water Pollution Prevention Plan (SWPPP) <br />Erosion Control <br />Traffic Control/ Detour Plan <br />Pavement Markings/Signing <br />Quality control review <br />Constructability Review <br />Project site walkthrough plan review <br />2 <br />O <br />IL <br />O <br />N <br />I <br />1 <br />H <br />N <br />