Laserfiche WebLink
Wild Ouks of Ramsey <br />,?ketch ?lan Review <br />,Ady l, 200.5 <br />2 oj' <br />Traffic Generation Analysis: Engineering Staff will review additional traffic generation <br />produced by the proposed plat at preliminary plat review. <br /> <br />Grading and Drainage Plans: Grading and drainage plans will need to be provided during. the <br />preliminary plat process. Ponding will be required prior to discharge into public water bodies <br />such as the on-site wetlands. A permit from the Lower Rum River Water Management <br />Organization will be required. <br /> <br />Streets and Access: The sketch plan proposes to convert the existing homestead's driveway on ' <br />173rd Avenue to a public street, staff is recommending that you consider future street connection <br />to the east and. south of your proposed plat. Staff has submitted the sketch plan to Anoka County <br />fi)r review and comment. <br /> <br />Sidewalks: City policy requires the installation of s-idewalks along one side of all non cul-de-sac <br />public streets in single-family developments. <br /> <br />Utilities: The new lots are proposed to be served by a common _septic system, but must also be <br />designed to be'served in the future with municipal sewer'and water. Detailed information on the <br />septic system, including pr/mary and secondary site locations an~' proposed well locations, must <br />be provided with the preliminary plat submittal. <br /> <br />Home Owners Association: A Home Owners'. Association' (HOA) is required for this <br />development, to manage and maintain the communal septic system. The City will review all <br />HOA documents prior to release of the final plat for recording. The HOA will be required to <br />establish a financial surety to insure the adequate operation and maintenance of the on site <br />system, and the eventual connection to the municipal system when it becomes ~ivailable. <br /> <br />Park Dedication: The sketch plan will be forwarded to the Park and Recreation Commission for <br />a recommendation on park dedication. The City has the option for land,:cash or a combination <br />thereof. [t is expected that a formal Park Dedication recommendation will occur at the <br />preliminary plat stage. <br /> <br />Trail Fee: Trail Fees must be paid for neW lots created prior to release of the final plat for <br />recording. A trail will need to be constructed on the east side of Armstrong Blvd., per the City's <br />Park and Trail Plan. <br /> <br />Sewer and Water Trunk Fee: Payment of sewer and water trunk fees for the proposed lots must <br />be detailed in the Development Agreement for the plat and/or in the HOA documents. <br /> <br />Stormwater Management Fee: A stormwater management fee must be paid for all new lots <br />being created. The rate in effect at the time of final plat approval .must be paid Pr~0r to the City's <br />release or' the final plat for recording. <br /> <br /> <br />