Laserfiche WebLink
Applicant Response <br />Updated By <br />Chris AndersonChris AndersonLen LintonLen LintonLen LintonTim GladhillChris AndersonChris AndersonAaron MadsenJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe <br /> FeriancekJoe FeriancekJoe Feriancek <br />PMPMPMPMPMAMAMAMPMPMPMPMPMPMPMPMPMPM <br />Markup Date <br />03/09/2021 9:55 03/09/2021 9:55 03/11/2021 2:10 03/08/2021 2:23 03/08/2021 2:19 03/08/2021 2:19 03/08/2021 2:19 03/08/2021 2:19 03/08/2021 2:14 03/08/2021 2:15 03/08/2021 <br /> 2:15 03/08/2021 2:15 <br />03/17/2021 12:17 03/17/2021 12:17 03/12/2021 12:57 03/12/2021 12:26 03/12/2021 12:25 03/11/2021 10:37 <br />Changemark Details <br />Show this distance between right of way boundary and parking area. Minimum required setback is 20 feet.This area will not accomodate future parking. Minimum required setback from right <br /> of way boundary Basin #1 is 2800 cf short of capturing the full infiltration volume. Our calculations indicate making the bottom Cul-de-sac has been constructed.Cul-de-sac with curb <br /> has been constructed.This sheet for street Correct shape and size.Need to add tree save fencing on the north side of boulevard trees as well to protect during construction Either add <br /> additional tree save fencing on the west side of existing boulevard trees or adjust silt fence so Rip rap outletsThe SWPPP calls out a stabilized construction exit, please show location <br /> on the plans.Profile must include vertical curves, 100' minimum length.Call out sidewalk dimension, detail.Provide City watermain lowering detail.Call out curb types for street and <br /> parking lot, assuming B618 for street and B612 for parking lot?Full width patch / mill at western entrance where cul-de-sac was removed.Pavement Section must match section from street <br /> construction plans; 2" wearing course, 2.5" non Add dimensions to paving plan.Call out 6" thick, 6 foot wide concrete sidewalk. Provide City sidewalk detail. <br />Changemark Subject <br />SetbackParking SetbackInfiltration VolumeSee comment on Street plan.Update Base drawingsCul De Sac ShapeTree Save FenceTree Save FenceRip RapStabilized Construction ExitProposed ProfileSidewalkWaterm <br />ain LoweringCurb Types147th Paving147th Lane TypicalDimensionsSidewalk Extension <br />Markup Name <br />CACALLLLLLTim GladhillCACAAaronJFJFJFJFJFJFJFJFJF <br />File <br />BUNKER LAKE #4-A1.pdfBUNKER LAKE #4-A1.pdf232511_SMP (2-3-21).pdfPAVING.pdfSTREET.pdfFINAL PLAT.pdfGRADING.pdfGRADING.pdfUTILITY.pdfGRADING.pdfSTREET.pdfSTREET.pdfSTREET.pdfSTREET.pdfPAVING.pdfPAVING <br />.pdfPAVING.pdfPAVING.pdf <br />Snapshot <br />Department <br />PlanningPlanningCivil Engineer IVCivil Engineer IVCivil Engineer IVCommunity Development DirectorEnvironmental ReviewEnvironmental ReviewLead Engineering TechCivil Engineer IICivil Engineer <br /> IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer II <br />Status <br />UnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolved <br />Complete? <br />FalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalse <br />303129282732242526211718192013141516 <br />Ref # <br />RA04682302/11/2021 1:34 PM03/26/2021 12:12 PM <br />Cycle <br />1 <br />Grouping <br />Changemarks Report Main Workflow <br />Project Name: Workflow Started: Report Generated: <br /> <br />