Laserfiche WebLink
Joe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekJoe FeriancekTim GladhillTim GladhillTim GladhillChris AndersonChris Anderson <br /> <br />PMPMPMPMPMPMPMAMAMPMPMPMAMPM <br />03/08/2021 2:03 03/08/2021 2:03 03/08/2021 2:03 03/08/2021 2:03 03/08/2021 1:38 03/08/2021 1:38 03/08/2021 1:38 03/02/2021 5:44 03/02/2021 5:43 03/02/2021 5:39 03/09/2021 <br /> 9:42 03/02/2021 4:04 <br />03/08/2021 11:42 03/08/2021 11:35 <br />Check (NW) Invert or slope from RC Apron.City likes 0.1' of fall across all structures.Confirm NE Invert elevation.Is a 6 inch line sufficient for interior fire suppression and for general <br /> water service to building?Make this more bold in the plans, difiicult to see with the topo lines adjacent.Make pavement removal full width (mill south half of 147th Lane.)Remove Curb <br /> and Gutter, and use existing edge of pavement (the front of curb) as the form for new Site Specific Typical required, replace City Plate STR-5.The most current CEAM specifications are <br /> now 2018 edition.Final Plat Sheet required. Parcel is an outlot that needs to be subdivided. These don't seem to match existing parcel lines.Need to agree to a cost share on Bunker <br /> Lake Boulevard Widening. Due to the reforstation requirements yet to be fulfilled for all of Bunker Lake Industrial Park (BLIP), Topsoil shall contain no more than 35% sand content. <br /> Amend Note 2 to specify this. <br />Outlet Structure #1Fall across StructuresOS #2Water ServiceSalvage Culvert and ApronsPavement Removal LimitsDriveway Tie-insTypical SectionCEAM SpecsFinal Plat SheetExisting Parcel LinesBunker <br /> Lake Cost Share AgreementTree SizesTopsoil <br />JFJFJFJFJFJFJFJFJFTim GladhillTim GladhillTim GladhillCACA <br />UTILITY.pdfUTILITY.pdfUTILITY.pdfUTILITY.pdfEXISTING.pdfEXISTING.pdfEXISTING.pdfDETAIL4.pdfTITLE.pdfBUNKER LAKE #4-A1.pdfEXISTING.pdfPAVING.pdfLANDSCAPE2.pdfLANDSCAPE1.pdf <br />Civil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICivil Engineer IICommunity Development DirectorCommunity <br /> Development DirectorCommunity Development DirectorEnvironmental ReviewEnvironmental Review <br />UnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolvedUnresolved <br />FalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalseFalse <br />967854321 <br />1011122322 <br />Changemarks Report <br /> <br />