My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/20/2021
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2021
>
Agenda - Public Works Committee - 04/20/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:32:50 AM
Creation date
4/20/2021 9:19:48 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/20/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 2. <br />Meeting Date: 04/20/2021 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Work requested by Minnesota DNR <br />• Construction proposed for 2022 <br />• Variolite Street Reconstruction (#20-01) <br />• Punch list work required in the spring/summer of 2021 <br />• Drain tile outlets will be routinely checked/cleaned to ensure pavement subgrade drainage is <br />maintained, especially during winter months <br />• Final payment anticipated summer/fall 2021 <br />• Riverdale Drive Reconstruction — Feldspar St. to Tungsten St. (#21-00) <br />• Contract executed, Notice to Proceed issued <br />• Preconstruction meeting being scheduled <br />• Construction to be substantially complete by early September <br />• Municipal Well #1 Casing Evaluation (#21-01) <br />• Work is complete <br />• No leaks were observed <br />• Tiger Street Reconstruction (#21-02) <br />• Advertised for bids, bid opening May 12 <br />• Construction proposed 2021 <br />• Business Park 95 Street Reconstructions (#21-03) <br />• Advertised for bids, bid opening April 19 (update during PWC meeting) Construction proposed 2021 <br />• 2021 Neighborhood Pavement Overlay Improvements (#21-04) <br />• Advertised for bids, bid opening April 19 (update during PWC meeting) <br />• Construction proposed 2021 <br />• 2021 MSA Pavement Overlay Improvements (#21-05) <br />• Advertised for bids, bid opening April 19 (update during PWC meeting) <br />• Construction proposed 2021 <br />• 2021 Crack Seal Improvements (#21-06) <br />• Contract executed, Notice to Proceed issued <br />• Construction to be complete by September <br />• Dolomite Street Demolition — Riverdale Drive to Highway 10 (#21-07) <br />• Bolton & Menk submitted plans to MnDOT State Aid <br />• Construction proposed for 2021 (with Riverdale Drive Reconstruction) <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />
The URL can be used to link to this page
Your browser does not support the video tag.