Laserfiche WebLink
Public Works Committee 6. 2. <br />Meeting Date: 04/20/2021 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Receive Staff Updates on Improvement Projects, Studies and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on current and proposed City, County and <br />MnDOT improvement projects and studies, and on other items of interest to the Committee. <br />City Improvement Projects <br />• Wetland 114P Outlet Control Improvements (#19-07) <br />• Work requested by Minnesota DNR <br />• Construction proposed for 2022 <br />• Variolite Street Reconstruction (#20-01) <br />• Punch list work required in the spring/summer of 2021 <br />• Drain tile outlets will be routinely checked/cleaned to ensure pavement subgrade drainage is <br />maintained, especially during winter months <br />• Final payment anticipated summer/fall 2021 <br />• Riverdale Drive Reconstruction — Feldspar St. to Tungsten St. (#21-00) <br />• Contract executed, Notice to Proceed issued <br />• Preconstruction meeting being scheduled <br />• Construction to be substantially complete by early September <br />• Municipal Well #1 Casing Evaluation (#21-01) <br />• Work is complete <br />• No leaks were observed <br />• Tiger Street Reconstruction (#21-02) <br />• Advertised for bids, bid opening May 12 <br />• Construction proposed 2021 <br />• Business Park 95 Street Reconstructions (#21-03) <br />• Advertised for bids, bid opening April 19 (update during PWC meeting) Construction proposed 2021 <br />• 2021 Neighborhood Pavement Overlay Improvements (#21-04) <br />• Advertised for bids, bid opening April 19 (update during PWC meeting) <br />• Construction proposed 2021 <br />• 2021 MSA Pavement Overlay Improvements (#21-05) <br />• Advertised for bids, bid opening April 19 (update during PWC meeting) <br />• Construction proposed 2021 <br />• 2021 Crack Seal Improvements (#21-06) <br />• Contract executed, Notice to Proceed issued <br />• Construction to be complete by September <br />• Dolomite Street Demolition — Riverdale Drive to Highway 10 (#21-07) <br />• Bolton & Menk submitted plans to MnDOT State Aid <br />• Construction proposed for 2021 (with Riverdale Drive Reconstruction) <br />Anoka County Improvement Projects <br />• Roundabout at Armstrong Boulevard/CSAH 83 and Alpine Drive <br />• Anoka County received $1.35M in HSIP funds (est. project cost = $1.5M) <br />