Laserfiche WebLink
• Anoka County and City of Ramsey share is $150,000 each (per $1.5M est.) <br />• Construction proposed for 2023, pending City & County approvals <br />• CSAH 116 Interim Improvements <br />• Anoka County revised concept level layout per Resolution #21-044 comments <br />• Evaluating benefits/costs to construct EB Sunwood Drive right turn lane <br />• Construction proposed to begin September 7, 2021 <br />• CSAH 116 & TH 47 Intersection Improvements <br />• Construction started April 12, 2021 <br />• Construction to be completed in 2021 <br />MnDOT Improvement Projects <br />• US 10 / 169 & Ferry Street / TH 47 Interchange <br />• Construction proposed 2022 - 2023 <br />• Ferry Street / Trunk Highway 47 Grade Separation @ BNSF Rail Crossing <br />o Preliminary design still on hold <br />o MnDOT exploring realignment of Highway 47 to remove S-curve, which would require the relocation <br />of Alter Recycling <br />o Tentatively proposed for construction in 2024 or later <br />• Rum River Bridge Replacement <br />• Construction proposed 2022 - 2023 <br />• Proposing three lanes between Highway 47 and 7th Street <br />Studies & Items of Interest <br />• Anoka Solution Highway 10 Improvements <br />• Construction proposed 2022 - 2023 <br />• NW Metro Surface Water Supply Feasibility Study <br />• Member cities include Corcoran, Dayton, Ramsey and Rogers <br />• MCES funded 100% using Clean Water Funds <br />• Study findings to be presented in May or June <br />• City of Ramsey Centralized Water Treatment Plant Feasibility Study <br />• Feasibility Study complete <br />• City Council approval requested in April or May <br />• Ramsey Gateway Highway 10 Improvements <br />• Preliminary design for grade -separation of Ramsey Blvd. and Sunfish Lake Blvd. is underway <br />• Approximately $84M in project funding has been secured <br />• Remaining funding continues to be pursued <br />• NW Metro Mississippi River Crossing Feasibility Analysis <br />• No updates at this time <br />• TH 47 Safety Study <br />• Study updates to be presented in May or June <br />• Reduced Speed Limits on Local Streets <br />• No new requests received since last discussed <br />• Staff continues to monitor actions in other cities <br />Timeframe: <br />Staff estimates up to 15 minutes will be needed for updates and discussion. <br />Observations/Alternatives: <br />NA <br />Funding Source: <br />NA <br />