My WebLink
|
Help
|
About
|
Sign Out
Home
04/29/21
Ramsey
>
Public
>
City Update
>
2021
>
04/29/21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:53:48 AM
Creation date
4/29/2021 4:02:17 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2021
Document Title
04/29/21
Retention Date
12/31/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Construction Updates <br />The construction contract for this project was awarded to Kuechle Underground, Inc. (KUI) in the amount of <br />$771,913.13. Again, property owners will not be assessed for any of the costs for this project. <br />In general, construction sequencing involves placing construction signs, installing silt fence and other sediment <br />control practices, reclaiming existing pavement, constructing underground utilities, grading boulevards and <br />streets, constructing concrete curb and gutter and driveway aprons and walks, grading and compacting aggregate <br />base, placing bituminous pavement on streets and driveways, and establishing turf. As always, our goal is to <br />complete construction as quickly as practical once construction begins to minimize impacts to the public. <br />Private lawn irrigation systems may be impacted by this work. Property owners are responsible for relocating <br />and/or repairing private irrigation systems within public right of ways to accommodate construction. If you have a <br />below ground irrigation system, please mark your sprinkler heads with flags to help prevent or minimize damage <br />to your system during construction. Flags are available at the Ramsey Municipal Center. To help ensure your <br />system will not be damaged during construction, please relocate sprinkler heads and other components located <br />within the construction limits, which City project inspector Aaron Madsen can locate for you upon request. <br />During the preconstruction meeting. KUI informed the City that construction will begin on Friday. April 30, with <br />reclaiming of the existing pavement. This work involves using a mobile pavement reclaiming machine to grind <br />the existing pavement up, along with a portion of the underlying aggregate base. This reclaim material is placed <br />back onto the street. A portion of the reclaim material will be left in place for use as new aggregate base, while <br />some will be hauled off site. New pavement will ultimately be placed over the compacted reclaim material. <br />Storm sewer construction is anticipated to begin mid -May, but as with all outside construction work, dates are <br />subject to change depending on weather and availability of equipment and materials. Groundwater dewatering <br />will be needed to install the stormwater pollution control structure. This will require shallow wells to be installed <br />where work is to occur, which is on the south side of Riverdale Drive approximately 800 feet east of Dolomite <br />Street. This work is anticipated to occur on May 10. A portable generator will power the wells. A permit from the <br />Department of Natural Resources is required for this work and has been applied for. <br />Access to properties will be maintained throughout construction as best as practical. City Staff will work with all <br />property owners during construction to ensure they are informed in advance of any work that will interrupt access <br />to their property for any length of time, such as when reconstructing driveway aprons. Access for emergency <br />services will be maintained throughout construction. <br />The Contractor will soon submit a detailed project schedule to the City. At that time, more information will be <br />added to the project web page. Substantial completion of construction is anticipated by September 3, 2021. <br />Additional construction update letters will be mailed periodically to properties having direct access onto <br />Riverdale Drive, and to properties on streets that directly connect to the reconstructed segment of Riverdale Drive. <br />Please contact me at bwestby(a,)cityoframsey.com or 763-433-9825 with any questions related to this letter or the <br />project in general. For questions related to construction, including special needs or requests during construction, <br />contact City inspector Aaron Madsen at amadsenidcit oframse .com or 763-286-2579. As always, the City is <br />committed to the success of its pavement management program and to working cooperatively with property <br />owners to minimize impacts during construction. <br />Sincerely, <br />Bruce Westby, City Engineer <br />