My WebLink
|
Help
|
About
|
Sign Out
Home
04/29/21
Ramsey
>
Public
>
City Update
>
2021
>
04/29/21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 11:53:48 AM
Creation date
4/29/2021 4:02:17 PM
Metadata
Fields
Template:
City Clerk
City Clerk Document Type
City Update
Document Date
12/31/2021
Document Title
04/29/21
Retention Date
12/31/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONSTRUCTION <br />City of Ramsey — Public Works <br />Progress Update <br />April 29, 2021 <br />The cassette lift (large vehicle lift) footing has been installed <br />in the Maintenance Bay. <br />Concrete slab preparation in the Office Area is on -going. The <br />concrete slab will be poured in the Office on Monday, <br />5/03/21. <br />Curb and gutter is getting installed by Stapf Concrete. This <br />work will be complete by the end of the week. <br />Follow us on Twitter @rjmconstruction <br />1 <br />discover the projects <br />RJl uilds <br />
The URL can be used to link to this page
Your browser does not support the video tag.