Laserfiche WebLink
CC Regular Session <br />Meeting Date: 04/27/2021 <br />Submitted For: Chloe McGuire Brigl, Community Development <br />By: Chloe McGuire Brigl, Community Development <br />Information <br />Title: <br />Adopt Resolution #21-090 Approving Storyteller Cafe, Case of Stories Foundation (Project 20-120) <br />5. 10. <br />Purpose/Background: <br />The purpose of this case is to review a proposed cafe within The COR from the Stories Foundation (the <br />"Applicant") for Storyteller Cafe. The project site is currently owned by the City and is under purchase agreement <br />from the Applicant. The site is approximately 0.52 acres and is part of Outlot B of the COR Stone Brook Academy <br />Plat. The project site is unaddressed and located between Sunwood Drive NW and Veterans Drive NW, and along <br />Yolite Street NW. The project proposes a mixed -use 2-story, 6,892 square foot building with a cafe, retail, office, <br />and event space on the ground floor, residential uses on the second floor (3 units), and on -site parking including a <br />drive-thru. <br />The Storyteller Cafe would serve breakfast and lunch as well as serving to provide office space to the nonprofit that <br />runs the cafe along with retail and event space. The nonprofit currently employs two full time staff and two part <br />time staff. The nonprofit would hire at least one more full time manager and 2-3 part time employees to run the <br />cafe/retail space. The nonprofit goal is to begin to use the space to offer job training in year two of operation. Job <br />training would be provided in a variety of industries and to vulnerable people and those who have been exploited. <br />Notification: <br />Notification is not required for Site Plan or Final Plat. <br />Observations/Alternatives: <br />The proposed project is located in the "COR-2 Commercial" subdistrict of the City's COR development plan. Below <br />is a brief analysis of the COR2 guidelines, with a full review attached. Please note that Staff has queued this up as a <br />contingent approval with some major contingencies listed below and included in the attached resolution. Typically, <br />projects at this phase (that require major updates) would not be coming to Council until plans are closer to <br />approval. However, this project has a scheduled closing date, and in order to get the Applicant feedback and allow <br />them to start on closing documents, Staff has brought this forward as a contingent approval. <br />Final plans will come back to Council for final approval. <br />Architecture <br />Structures within this subdistrict are expected to make The COR unique, inviting and memorable. Architecture is to <br />be '4-sided' at all locations visible to public areas. Emphasis is placed on great design along the public street <br />frontage. The Applicant provided an image showing the front of the structure (north elevation) but not the east, <br />west, or south elevations. The north elevation shows quality materials and a high level of architecture and Staff is <br />supportive of the architecture shown but will need to see the elevations of the other three sides of the building to <br />verify the "4-sided" architecture. <br />• Contingency of Approval: Provide elevations for all 4 sides of the building including 4 sided architecture <br />with no vinyl lap siding, update rear elevation with additional articulation. Move garbage enclosure away <br />from drive-thru lane. Confirm that ADA Parking Stalls meet State requirements. <br />Build to Line <br />The build to line required is 15 feet. That distance is to be measured from building front to right-of-way (40% of <br />