Laserfiche WebLink
front facade required to be within the max.) <br />• Contingency of Approval: Revise the site plan to be a maximum of 15 feet from Sunwood Drive property <br />line. Delineate edge of patio with planters, planter boxes, or another edging treatment to help clearly identify <br />public and private areas. <br />Off-street parking and access <br />The applicant has proposed a parking area located on the south part of the lot, with two proposed parking accesses <br />along Yolite Street NW. There are 14 parking stalls proposed, which includes two accessible stalls located closest to <br />the building. The parking standards in the COR District are as follows: 2 stalls per 1,000 square feet for retail and <br />office uses and 3 stalls per 1,000 square feet for restaurant uses. A more detailed breakdown of the floorplan would <br />enable staff to calculate the required stalls for the building. <br />Drive thru: The applicant has proposed a drive thru. Adequate stacking distance of not less than five vehicles shall <br />be provided. The site plan should more clearly define the drive thru area and must demonstrate the provision for <br />stacking space does not interfere with other drive areas, parking spaces, sidewalks, or pedestrian access to the main <br />entry of the building. <br />Screening shall be provided of automobile headlights in the drive-thru lane to windows and doors of adjacent uses. <br />Screening must be at least three feet in height at installation and fully opaque, consisting of a wall, fence, dense <br />vegetation, berm or grade change. <br />• Contingency of Approval: Modify drive-thru onsite to meet stacking requirements and safe traffic entrances. <br />Provide a stacking diagram and ensure that the diagram shows headlight direction and update with screening <br />onsite if needed. Add bike rack to site. <br />Residential Component <br />The floor plan on the second floor shows three apartment units. The Subject Property is approximately 0.52 acres. <br />This project is the city's first true vertically mixed use (residential/commercial) building. <br />Next Steps <br />Tonight's approval is a contingent approval allowing the Applicant some surety that the City is supportive of the <br />project moving forward. After plans are updated, Staff will bring the project back for final approvals. Additionally, <br />a development agreement must come back for Council approval. <br />Funding Source: <br />Costs associated with this proposal are the responsibility of the Applicant. <br />Recommendation: <br />Staff is supportive of the project moving forward with contingencies and direction as noted throughout the case. <br />Staff recommends approving the project contingent upon approved plans, which require significant engineering <br />updates to ensure the project site functions (e.g. grading, utilities, paving, etc.). Staff will bring the project back <br />after plans are updated for final approval. Staff recommends a contingent approval at this time to allow the <br />Applicant to begin closing on the Subject Property and provide the Applicant some assurance that the City is <br />supportive of the project. <br />Action: <br />Motion to adopt Resolution #21-090 approving the project contingent upon revised plan sheets. <br />Attachments <br />Site Location Map <br />Site Plan <br />Plat <br />Building Elevation <br />