Laserfiche WebLink
Alternative #1 — Motion to adopt Resolution #21-106 accepting bids and awarding a construction contract for <br />Business Park 95 Street Reconstructions, Improvement Project #21-03, to North Valley, Inc. for the total bid in the <br />amount of $942,685.58. <br />Alternative #2 — Motion to adopt Resolution #21-106 accepting bids and awarding a construction contract for <br />Business Park 95 Street Reconstruction, Improvement Project #21-03, to North Valley Inc. for the base bid in the <br />amount of $801,763.35. <br />Alternative #3 — Motion to deny adoption of Resolution #21-106 at this time. <br />Funding Source: <br />Bids were advertised in the Anoka Union Herald and in Finance and Commerce on March 26 and April 2, 2021. On <br />April 19, 2021 a total of five (5) bids were received, opened, and tabulated, and the following bids were found to <br />comply with the advertisement for bids. <br />CONTRACTOR <br />BASE BID ALT. A BID <br />North Valley, Inc. <br />$ 801,763.35 $ 140,922.23 <br />Douglas -Kerr Underground, <br />L.L.C. <br />Asphalt Surface Technologies <br />Corp. <br />Kuechle Underground Inc. <br />Park Construction Company <br />Engineer's Estimate <br />TOTAL BID <br />$ 942,685.58 <br />$ 823,460.08 $ 136,162.50 <br />$ 817,550.31 $ 156,383.93 <br />$ 959,622.58 <br />$ 973,934.24 <br />$ 925,740.63 $ 150,022.00 <br />$ 1,075,762.63 <br />$ 924,682.94 $ 167,434.35 <br />$ 1,092,117.29 <br />$ 1,000,414.80 $ 164,601.00 <br />$ 1,165,015.80 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $942,685.58 for the total bid for <br />construction of said improvements in accordance with the approved plans and specifications and advertisement for <br />bids, is the lowest responsible bidder, regardless of whether Bid Alternate A is awarded in addition to the base bid. <br />Adding indirect costs in the amount of 23% brings total project costs to $1,159,503.26. <br />Per the final plans and specifications, estimated construction costs were $1,165,015.80. The low bid is 19% less <br />than the engineer's estimate, primarily due to lower than estimated bituminous paving and concrete cost. <br />Funding sources for these improvements includes a mix of Pavement Management Funds, Stormwater Funds, <br />Public Improvement Revolving Funds, and budgeted funds from the 2020 amended mill and overlay improvements. <br />• Pavement Management Funds = $580,186.18 <br />• Stormwater Funds = $235,144.98 <br />• Public Improvement Revolving Funds = $94,172.10 <br />• 2020 Budgeted Funds = $250,000.00 <br />• Total Project Costs = $1,159,503.26 <br />Based on discussions with the Public Works Committee, the alternate bid work is proposed to be funded using the <br />PIR fund. The committee felt this work, if awarded, should not be funded through the pavement management fund. <br />The storm sewer work associated with the bid alternate is proposed to be funded using stormwater funds. <br />Bolton & Menk proposes to provide construction staking in a total not -to -exceed amount of $3,250 for the base bid, <br />and $6,240 for the base bid plus the alternate bid. These costs are included in the 23% indirect costs. Staff feels <br />these costs are reasonable based on the scope of the proposed improvements and required staking and recommends <br />accepting the proposal, which is attached for reference. <br />City Staff proposes to administer and inspect construction. <br />Plans and specifications were prepared in-house as part of Staff's normal duties. <br />