My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/27/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 04/27/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 2:57:46 PM
Creation date
5/11/2021 10:31:43 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/27/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
578
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Outside costs incurred to date as engineering indirect costs include: <br />• $4,064.00 for Chosen Valley Testing, Inc. to prepare the Geotechnical Exploration and Engineering Review <br />• $4,860.00 for Bolton & Menk, Inc. to collect topographic survey <br />Recommendation: <br />Staff recommends Alternative #1. Awarding the base bid plus bid alternate A will provide the greatest level of <br />safety to the traveling public, to private commercial trucks that use the east end of McKinley Street, including trash <br />collection trucks and semis, and to City vehicles including snow plows and public safety vehicles. Constructing the <br />cul-de-sac will allow these vehicle to safely turn around using the cul-de-sac, which is located fully within <br />City -owned right of way, instead of backing up. Awarding bid alternate A will also allow the City's utility vehicle <br />better access to the sanitary sewer trunk line located just east of the proposed cul-de-sac. <br />Action: <br />Motion to adopt Resolution #21-106 accepting bids and awarding a construction contract for Business Park 95 <br />Street Reconstructions, Improvement Project #21-03, to North Valley, Inc. for the total bid in the amount of <br />$942,685.58. <br />21-03 Final Plans <br />B&M Staking Proposal <br />21-03 Street Segment Summary <br />Resolution 21-016 <br />Inbox <br />Bruce Westby <br />Kurt Ulrich <br />Form Started By: Joe Feriancek <br />Final Approval Date: 04/22/2021 <br />Reviewed By <br />Bruce Westby <br />Kurt Ulrich <br />Attachments <br />Form Review <br />Date <br />04/22/2021 02:44 PM <br />04/22/2021 02:49 PM <br />Started On: 04/20/2021 07:49 AM <br />
The URL can be used to link to this page
Your browser does not support the video tag.