Laserfiche WebLink
Outside costs incurred to date as engineering indirect costs include: <br />• $4,064.00 for Chosen Valley Testing, Inc. to prepare the Geotechnical Exploration and Engineering Review <br />• $4,860.00 for Bolton & Menk, Inc. to collect topographic survey <br />Recommendation: <br />Staff recommends Alternative #1. Awarding the base bid plus bid alternate A will provide the greatest level of <br />safety to the traveling public, to private commercial trucks that use the east end of McKinley Street, including trash <br />collection trucks and semis, and to City vehicles including snow plows and public safety vehicles. Constructing the <br />cul-de-sac will allow these vehicle to safely turn around using the cul-de-sac, which is located fully within <br />City -owned right of way, instead of backing up. Awarding bid alternate A will also allow the City's utility vehicle <br />better access to the sanitary sewer trunk line located just east of the proposed cul-de-sac. <br />Action: <br />Motion to adopt Resolution #21-106 accepting bids and awarding a construction contract for Business Park 95 <br />Street Reconstructions, Improvement Project #21-03, to North Valley, Inc. for the total bid in the amount of <br />$942,685.58. <br />21-03 Final Plans <br />B&M Staking Proposal <br />21-03 Street Segment Summary <br />Resolution 21-016 <br />Inbox <br />Bruce Westby <br />Kurt Ulrich <br />Form Started By: Joe Feriancek <br />Final Approval Date: 04/22/2021 <br />Reviewed By <br />Bruce Westby <br />Kurt Ulrich <br />Attachments <br />Form Review <br />Date <br />04/22/2021 02:44 PM <br />04/22/2021 02:49 PM <br />Started On: 04/20/2021 07:49 AM <br />