Laserfiche WebLink
BOLTON <br />& MENK <br />Real People. Real Solutions. <br />March 22, 2021 <br />Bruce Westby, P.E. <br />City Engineer <br />7550 Sunwood Drive NW <br />Ramsey, MN 55303 <br />7533 Sunwood Drive NW <br />Suite 206 <br />Ramsey, MN 55303-5119 <br />Ph: (763) 433-2851 <br />Fax: (763) 427-0833 <br />Bolton-Menk.com <br />RE: Proposal for Construction Staking Services, City of Ramsey — Tiger Street Reconstruction (City <br />Project No. 21-02) <br />Dear Mr. Westby: <br />We appreciate the opportunity to assist the City of Ramsey with construction staking for the Tiger Street <br />Reconstruction project (City Project No. 21-02). <br />Bolton & Menk will complete the following survey staking for the project: <br />• Silt Fence, <br />• Subgrade, <br />• Class 5 Aggregate Base Course, and <br />• Pavement Markings. <br />We have made the following assumptions in preparing this proposal: <br />• 6 hours of office surveyor time will be required to prepare the files, and <br />• 24 hours of field survey time will be required. <br />All work will be completed for a Not -to -Exceed amount of $4,680. If there are any questions, please call <br />me at (651) 968-7760. <br />Sincerely, <br />BOLTON & MENK, INC. <br />Kevin P. Kielb, P.E. <br />Principal Engineer <br />C:\Users\kevinki\Desktop\Ramsey 2021 Staking\Ramsey Staking Survey - Tiger Street 03222021.docx <br />Bolton & Menk is an equal opportunity employer. <br />