My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 06/22/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:01:47 PM
Creation date
7/19/2021 8:35:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 5. 10. <br />Meeting Date: 06/22/2021 <br />By: Chloe McGuire Brigl, Community <br />Development <br />Information <br />Title: <br />Adopt Resolution #21-158 Approving Site Plan, Final Plat and Preliminary Grading Agreement for Oppidan <br />Industrial, 8200 Bunker Lake Blvd NW <br />Purpose/Background: <br />The purpose of this case is to review a request from Oppidan Holdings, LLC (the "Applicant") for a site plan for a <br />new speculative industrial project with three separate buildings. The Planning Commission has previously seen this <br />request as a sketch plan/preliminary review of two different concepts. The Applicant has chosen to move forward <br />with a 3 building industrial concept. The Planning Commission met at their June meeting and reviewed the <br />proposed project. They unanimously recommended approval of the project. This case also includes a preliminary <br />grading agreement, allowing the owners to clear and grade the site after plans are approved. A standard, template <br />development agreement is attached. <br />Notification: <br />The City attempted to notify property owners, as noted in the Anoka County Property Records, within 700 feet of <br />the proposed development for the June Planning Commission meeting. No comments were received. <br />Observations/Alternatives: <br />The Site Plan appears to meet all of the requirements for the E-3 Industrial District. <br />Bulk Standards: <br />Standard <br />ii- <br />Requirement <br />Minimum lot size <br />Minimum lot width <br />1 acre <br />200 feet <br />Proposed <br />8.63, 8.76, 9.67 acres <br />All 200+ feet <br />Building setbacks <br />Front <br />Rear <br />Side <br />Building 1: 146 ft <br />35 feet Building 2: 175 ft <br />Building 3: 61 ft <br />Building 1: 80 ft <br />25 feet Building 2: 80 ft <br />Building 3: 90 ft <br />Building 1: 60, 140 ft <br />25 feet Building 2: 60, 100 ft <br />Building 3: 60, 130 ft <br />Major and minor arterials <br />60 feet from <br />centerline of <br />road <br />right-of-way Closest point = 120 ft <br />plus the local <br />applicable <br />setback <br />
The URL can be used to link to this page
Your browser does not support the video tag.