My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/22/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 06/22/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:01:47 PM
Creation date
7/19/2021 8:35:54 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/22/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
672
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
From service road <br />Buildings <br />Off-street parking, storage <br />areas, and driveways <br />30 feet <br />r0 feet <br />40 feet <br />Parking and pavement <br />setback from street <br />right-of-way <br />Maximum building height <br />Maximum lot coverage <br />Parking: <br />20 feet <br />65 feet <br />45 percent <br />n/a <br />Appears to comply <br />60 feet at closest point <br />60 feet at closest point <br />Appears to comply <br />j43% (without outlot) <br />Required parking for Building 1 <br />.Industrial (94,605 sq ft) = 95 stalls <br />• Office (16,965 sq ft) = 56 stalls <br />• Required = 151 <br />• Proposed = 211 <br />Required parking for Buildings 2 and 3 <br />.Industrial (124,950 sq ft) = 125 parking stalls <br />• Office (22,050 sq ft) = 74 parking stalls <br />• Required = 199 stalls <br />• Proposed = 216 <br />Wetlands: Wetlands are along the north end of the site. There needs to be a 16.5 foot easement from the edge of <br />any wetland. <br />Streets and Access: There are two proposed new accesses onto Bunker Lake Blvd, there is one shared access <br />proposed with the property to the west. <br />Code Section: Section 117-124: E-3 Employment District <br />Funding Source: <br />The Applicant is responsible for all costs associated with review. <br />Recommendation: <br />The Planning Commission recommends approval of the project. <br />Action: <br />Motion to adopt Resolution #21-15 8 approving the site plan, final plat, and preliminary grading agreement for <br />Oppidan. <br />Attachments <br />Site Location Map <br />Architectural Plan Set <br />Civil Engineering Plan Set <br />Landscape Plan Set <br />Plat Materials <br />Staff Review <br />Planning Memo <br />
The URL can be used to link to this page
Your browser does not support the video tag.