Laserfiche WebLink
ENGINEER'S ESTIMATE FOR SITE IMPROVEMENTS <br />BUNKER LAKE INDUSTRIAL PARK BUILDING #4 - RAMSEY, MN <br />JUNE 9, 2021 <br />46 <br />INSTALL CASTING <br />1 <br />EACH <br />$75.00 <br />$75.00 <br />47 <br />6 IN CL 53 DIP WATERMAIN <br />253 <br />LIN FT <br />$40.00 <br />$10,120.00 <br />48 <br />12 IN CL 52 DIP WATERMAIN <br />244 <br />LIN FT <br />$55.00 <br />$13,420.00 <br />49 <br />4" POLYSTYRENE INSULATION <br />48 <br />SQ FT <br />$1.50 <br />$72.00 <br />50 <br />6 IN GATE VALVE <br />1 <br />EACH <br />$2,200.00 <br />$2,200.00 <br />51 <br />HYDRANT <br />1 <br />EACH <br />$3,000.00 <br />$3,000.00 <br />52 <br />INSTALL HYDRANT, GATE VALVE, AND REDUCER <br />1 <br />EACH <br />$1,000.00 <br />$1,000.00 <br />TOTAL ESTIMATED CONSTRUCTION COST OF UTILITIES <br />$159,524.00 <br />ITEM <br />NO. <br />PARKING LOT AND STREET CONSTRUCTION <br />ITEM DESCRIPTION <br />COST <br />QUANTITY <br />ESTIMATE <br />UNIT UNIT PRICE <br />ESTIMATED COST <br />53 <br />SAWCUT BITUMINOUS PAVEMENT FULL DEPTH <br />136 <br />LIN FT <br />$1.50 <br />$204.00 <br />54 <br />REMOVE BITUMINOUS PAVEMENT <br />939 <br />SQ YD <br />$1.00 <br />$939.00 <br />55 <br />REMOVE CURB AND GUTTER <br />484 <br />LIN FT <br />$5.00 <br />$2,420.00 <br />56 <br />SALVAGE SIGN <br />4 <br />EACH <br />$50.00 <br />$200.00 <br />57 <br />MILL BITUMINOUS SURFACE <br />173 <br />SQ YD <br />$4.00 <br />$692.00 <br />58 <br />AGGREGATE BASE CLASS 5 RAMSEY MODIFIED <br />6,745 <br />TON <br />$14.00 <br />$94,430.00 <br />59 <br />CONCRETE PAVEMENT 8 IN <br />705 <br />SQ YD <br />$48.00 <br />$33,840.00 <br />60 <br />BITUMINOUS MATERIAL FOR TACK COAT <br />658 <br />GAL <br />$3.00 <br />$1,974.00 <br />61 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (2,B) <br />1,241 <br />TON <br />$56.00 <br />$69,496.00 <br />62 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (2,B) <br />1,596 <br />TON <br />$52.00 <br />$82,992.00 <br />63 <br />TYPE SP 9.5 WEARING COURSE MIXTURE (3,C) <br />243 <br />TON <br />$58.00 <br />$14,094.00 <br />64 <br />TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,C) <br />276 <br />TON <br />$54.00 <br />$14,904.00 <br />65 <br />CONCRETE WALK 4 IN <br />6,566 <br />SQ FT <br />$3.00 <br />$19,698.00 <br />66 <br />CONCRETE CURB AND GUTTER B612 <br />4,106 <br />LIN FT <br />$15.00 <br />$61,590.00 <br />67 <br />4 IN SOILD LINE PAINT <br />2,574 <br />LIN FT <br />$1.00 <br />$2,574.00 <br />68 <br />PAVEMENT MESSAGE <br />6 <br />EACH <br />$250.00 <br />$1,500.00 <br />69 <br />INSTALL SIGN <br />4 <br />EACH <br />$100.00 <br />$400.00 <br />TOTAL ESTIMATED CONSTRUCTION COST OF PARKING LOT AND STREET CONSTRUCTION <br />$401,947.00 <br />ITEM <br />NO. <br />LANDSCAPING CONSTRUCTION COST <br />ITEM DESCRIPTION <br />ESTIMATE <br />QUANTITY UNIT <br />UNIT PRICE <br />ESTIMATED COST <br />70 <br />TOPSOIL BORROW RAMSEY MODIFIED <br />1,300 <br />CU YD <br />$26.00 <br />$33,800.00 <br />71 <br />SEEDING <br />2.4 <br />ACRE <br />$1,000.00 <br />$2,400.00 <br />72 <br />SEED MIX25-131 <br />325.0 <br />POUND <br />$4.00 <br />$1,300.00 <br />73 <br />SEED MIX 33-262 <br />41.0 <br />POUND <br />$30.00 <br />$1,230.00 <br />74 <br />SOD <br />2,628 <br />SQ YD <br />$4.25 <br />$11,169.00 <br />75 <br />DECIDUOUS TREE (2-1/2" CALIPER) (B&B) <br />50 <br />EACH <br />$300.00 <br />$15,000.00 <br />76 <br />CONIFER TREE (6'-0") (B&B) <br />18 <br />EACH <br />$280.00 <br />$5,040.00 <br />77 <br />SHRUBS 5 GAL POT <br />225 <br />EACH <br />$110.00 <br />$24,750.00 <br />78 <br />PERENNIALS 1 GAL POT <br />114 <br />EACH <br />$75.00 <br />$8,550.00 <br />TOTAL ESTIMATED CONSTRUCTION COST OF LANDSCAPING <br />$103,239.00 <br />S:\PRIVATE\2300\2325.11\2325.11 Engineers Estimate <br />6/14/2021 <br />