Laserfiche WebLink
fA)ii <br />RTEL <br />ARCHITECTS <br />Date: June 22, 2021 <br />To: Grant Reimer — City of Ramsey Public Works Superintendent <br />From: Andrew Cooper, Principal <br />RE: Additional Design Services Proposal — Ramsey Public Works Salt and Sand Building <br />1795 St. Clair Avenue <br />St. Paul, MN 55105 <br />(651) 696-5186 <br />www.oertelarchitects.com <br />We have established our scope of work and associated fee based on the following design phases required for the <br />design and construction of the salt sand building on the new public works facility site. <br />- Architectural Design: Site Plan, Overall building dimensioning, placement and design of any specific features. <br />- Civil Site Design: Site Removals, Grading and erosion control, Landscape adjustments and associated details. <br />- Structural Design: Footings and Foundations only. Salt Building superstructure is delegated design by provider. <br />- Electrical Design: Power and lighting plans. <br />Salt Building Design and Construction <br />Oertel Architects based our scope of work on the following general assumptions: <br />• The new salt building will be approximately 80' x 100' or as physical constraints allow for ultimate size, based <br />on provided designs by permissible manufacturers of the super structure. <br />• The new salt building will be a fabric covered, galvanized steel super structure, placed on appropriate structural <br />support. The profile of this building will be similar to the existing salt building, in a gable style shape. The <br />structural design of the super structure and fabric covering is delegated design to the building provider. <br />• New material containment walls will be placed within the overall footprint of the new building. These walls are <br />either precast L or T shaped walls or site -cast concrete walls. <br />• The floor of the new salt building will be paved asphalt <br />• Electrical provided at this location will be utilized for miscellaneous power connections and appropriate lighting <br />for operational uses. <br />• The procurement method for the salt building super structure will be via Sourcewell, with delegated design to <br />the selected manufacturer. <br />• Oertel Architects will handle additional coordination meetings and construction observation. <br />• The City of Ramsey will provide special inspections for all footings/foundations and erection of the super <br />structure. <br />