Laserfiche WebLink
July 21, 2005 <br />Ramsey Town Center 8th Addition Final Plat <br />Page 2 ot"3 <br /> <br />l'agc 15 <br /> <br />Water service detail needs to be coordinated with <br />layout. <br />Catch basins are not accepted in radius of curbs. <br /> <br />typical residential service <br /> <br />Page 16 <br /> · <br /> <br />Trail easements are required over the portion of walk outside the right-of-way. <br />The easement must be recorded after the plat is recorded. <br /> <br />Page 17-19 <br /> · <br /> · <br /> <br />Lot and Block Numbers must be shown on the plans. <br />The City and Lower Rum River WMO (LRRWMO) rules require the lowest floor <br />elevation to be 2 feet above the 100 year flood elevation. The LRRWMO does <br />have a calculation procedure for placing floors below the 100 year level of <br />backyard ponding areas such as this. Calculations must be submitted to the <br />LRRWMO and City for verification. <br />The drainage and utility easements must cover the area shown to be covered by <br />the 100 year event. <br />Labels need to be moved off fi-om underlying line work. A match line must be <br />provided on sheets 18 and 19. <br /> <br />Page 22-23 <br /> <br />Labels need to be moved off fi-om underlying line work. A match line must be <br />provided on sheets 18 and 19. <br /> <br />Page 24 <br /> <br />The plat shows the ROW for Zeolite Street at 80 feet, the typical section shows 60 <br />feet. <br /> <br />Pagc 25, 26 <br /> · A match line must be provided. <br /> <br />Page 31 <br /> · Labels must be moved offfrom the lines. <br /> <br />Utility Plans <br /> · Insulation must be called out between storm sewer crossings and watermain or <br /> watennain must be lowered (multiple locations). <br /> · Invert information is not consistent across pages (multiple locations). <br /> · Typical 1" water services may require insulation or need to be lowered to provide <br /> separation from storm sewer. <br /> · Continuation notes are required. The RTC 9th Addition plans provide most of the <br /> required continuation notes. Continuation is not required if the line continues onto <br /> the immediate next page in the set. <br /> · Crossing pipes are not consistently shown in plan or profile views. <br /> <br /> <br />