Laserfiche WebLink
Fined Plat and Final Site Plan Review: Rantsey Town Center 9th Addition <br />,&ly 22, 2005 <br />?~ge 6 <br />23. Landscaping: The landscaping plan is generally accep.table with one note. When the trees <br /> are installed, they must be at least thirty-five (35) feet from the back of curb of an intersecting <br /> street. The boulevard trees along 147th Lane may need to be shifted slightly to satisfy this <br /> requirement. <br /> <br />2d. Density Transition: The City Council, at their June 28, 2005 meeting, reviewed the plan and <br /> found it acceptable regarding density transitioning. <br /> <br />25. <br /> <br />Gronnd Cover/Irrigation: The development is required to establish sod in all areas not <br />improved with structures or pavement. An irrigation system will need to be provided <br />throughout the development where sodded and landscaped areas will be established. Any <br />irrigation systems will need to be reviewed and approved by the City Engineer. <br /> <br />24. <br /> <br />Mailbox Location: The placement of mailboxes for the townhome units should be located <br />along tim private streets when possible. Location of mailboxes along public streets will need <br />to be clustered and is subject to the review and approval of the Streets Supervisor. <br /> <br />25. <br /> <br />Address Signage: The City will be requiring an address location sign (specifying the units <br />addresses) to be placed at the entrance of all private streets. The required signage will assist <br />emergency services in locating a specific unit when called to the site. In order to assist Staff <br />in review of the placement of signs and to ensure an orderly look of the site, please revise the <br />signage and striping plan to show address signs. The address signage is subject to the review <br />and approval of the City Engineer and Police Chief. It should be noted that signs identifying <br />the development will require a separate sign permit. <br /> <br />26. REU Number: The City has enacted a quarterly drainage utility charge. The charge for <br /> townhomes is the same as for single family residences and is currently $6.30/quarter. <br /> <br />Tho City Council will be meeting at 7:00 p.m. on Tuesday, July 26, 2005 at the Ramsey Fire <br />Station No. I, 15050 Armstrong Blvd. NW, to review your f'maI plat and site plan. A copy of the <br />case cover sheet is enclosed. If you have any questions or need additional information, pleaSe <br />don't hesitate to contact me. <br /> <br />Respectfully, <br /> <br /> my (~, AICP <br />A ssoci ate Planner <br /> <br />Leonard Linton, P.E. <br />Civil Engineer II ~ <br /> <br />ecl <br /> <br />Grog Voss, Ramsey Town Center LLC (via entail,) <br />Thomas Lincoln, URS (via emaiO <br />Kevin Miller, URS (via entail,) <br /> <br /> <br />