My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/26/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 07/26/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:53:13 PM
Creation date
7/22/2005 3:48:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/26/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
15153 Nowthen Boulevard NW Ramsey, MN 55303 <br /> <br /> City Hall: (763) 427-1410 Fax: (763) 427-5543 <br /> www. ci.ramsey, mn.us <br /> <br />Memo <br /> <br />~lb: <br /> <br />FroJn: <br /> <br />CC: <br /> <br />Date: <br /> <br />Re: <br /> <br />Kevin Miller, URS <br /> <br />Leonard Linton <br /> <br />Greg Voss, file <br /> <br />July 21,2005 <br />RTC 9~ Addition Final Plat review comments <br /> <br />We have reviewed the RTC 9th Addition plans submitted for final plat approval. The plans <br />were received July 12, 2005. The following comments need to be addressed prior to receiving <br />approval of the final plat: <br /> <br />Page 11 <br /> <br />Page 14 <br /> <br />Conductivity must be provided from the watermain to the end of the 2" water <br />services. <br /> <br />Update the hydrant detail. <br /> <br />Page I6 <br /> · Catch basins are not accepted in radius of curbs. <br /> <br />Page 17 <br /> <br />Revise note at 148th Terrace to "Adjacent Property Owner" instead of "Town <br />Center Gardens Development". <br /> <br />]'age 24 <br /> <br />The grading plan shows the tie in of contours off the site as requested, however, <br />the contours tie into the existing grades along 147th Lane. It is anticipated that 8° <br />addition will be under construction at the same time. An overall grading plan is <br />required for 8th, 9th and 10th additions showing how the proposed grading for each <br />phase ties together. <br />The proposed storm sewer system must be reviewed with the goal of directing <br />runoff to the existing wetland in North Park to provide recharge for this wetland. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.