My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/26/2005
Ramsey
>
Public
>
Agendas
>
Council
>
2005
>
Agenda - Council - 07/26/2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/21/2025 1:53:13 PM
Creation date
7/22/2005 3:48:41 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
07/26/2005
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
517
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Along with the construction of the homes and businesses, a network of streets and City utilities will be required to <br /> serve this development. The proposed street network layout can also be seen on the concept layout. The proposed <br /> street network connects the City's existing streets on US Highway 10, Armstrong Boulevard and.Alpine Drive. <br /> The connection of sanitary sewer to ser~e this area will need to be connected to existing sanitary sewer lines in the <br /> City. Itl the current proposed area of the Pine Shadows development, a proposal for a new 18 inch trunk sewer is <br /> already m)derway. Oace completed, connection from the Pulte Homes development to this trunk sewer will need to <br /> be made. This increase in flow and its effects on the treatment facility are discussed later. <br /> Like thc sanitary sewer, there is no existing water main close to the proposed area of the Pine Shadows <br /> development. All current water usage in the area is coming from private wells. The City of Ramsey has a proposal <br /> for expansion of water main closer to the proposed Pine Shadows development. Once completed, connection of this <br /> area to the City's water source could be accomplished. The City is also planning to route a water transmission.main <br /> throngh tile Pine Shadows development area to a nearby water treatment facility in the future. Impact of adding this <br /> development area to the City's water distribution system will be discussed further in this report. <br /> Thc surrounding land use is zoned residential and rural reserve on the north and northeaSt sides. To the southeaSt is <br /> the Town Center. On the west and northwest sides, the area is zoned for a Planned Unit Development (mixed use, <br /> residential/commercial, with an overall density cfa maximum of 4 units per net acre). US Highway 10 runs along <br /> tile south border of the project site, and to the south of the highway the land js zoned residential. <br /> Development of the site will involve modification of the original topography to accommodate the construction of <br /> roads, homes, utilities, and storm water management facilities. The main equipment for grading the project Will be <br /> bulldozers, scrapers, compactors, backhoes and other standard earth-moving equiPment. The sequence of' <br /> construction will follow standard practices for conventional land modification for residential subdivisions. The <br /> construction activities will begin with the installation of erosion control measures, followed by overall site grading · <br /> and road construction, construction of the storm water management systems, the installation of utility services such <br /> ms natural gas, cable, telephone lines and ending with the establishment Of a permanent vegetative cover. <br /> Construction of homes and apartments on the individual lots is proposed to begin lath in the 2005 or early in the <br /> 2006 construction season and continue as each lot is sold. Construction of the apartments will be the first with <br /> development expanding to the west. It is estimated that 2 to 3~years is required to complete all the constructi0n- <br /> associated with building homes. Additional land disturbances such as custom grading operations are expected as <br /> homes are constructed on the individual lots. Erosion and turf establishment controls for individual lot construction <br /> are required as part of the City of Ramsey building permit. <br /> Streets and cul-de-sacs will be constructed to City of Rarnse'y specifications. <br /> <br />c. Project Purpose <br /> Thc purpose of this project is to provide residential housing to up to 768 families in Ramsey. Ramsey has an active <br /> real estate market and there is an increasing demand for housing. The primary beneficiaries are the developers, and <br /> thc people purchasing the lots. This project is not being carried out by a governmental unit. <br /> <br />d. Are future stages of this development, including development on any outlets, planned <br /> or likely to happen? If yes, briefly describe future stages, relationship to present <br /> project, timeline and plans for environmental review. <br /> · No <br /> ~ Yes <br /> <br />e. Is this project a subsequent stage of previous project? If yes, briefly describe the past <br /> development, timeline and any past environmental.review. <br /> · No <br /> ~ Yes <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.