Laserfiche WebLink
Advertisements were published in the Anoka Union Herald and in Finance & Commerce on June 25 and July 2, <br />2021. Bids were also advertised on-line on QuestCDN. <br />If Council awards the project, project notification letters will be mailed to property owners impacted by the <br />construction project. <br />Time Frame/Observations/Alternatives: <br />Observations/Alternatives: <br />Motion to adopt Resolution #21-200 accepting bids and awarding a construction contract for 2021 Additional <br />Pavement Overlay Improvements, Improvement Project #21-12, to North Valley, Inc. for the bid in the amount of <br />$563,416.59. <br />Funding Source: <br />Bids were advertised in the Anoka Union Herald and in Finance and Commerce on June 25 and July 2, 2021. On <br />July 19, 2021 a total of six (6) bids were received, opened, and tabulated, and the following bids were found to <br />comply with the advertisement for bids. <br />CONTRACTOR � a <br />North Valley, Inc. <br />Valley Paving, Inc. <br />Bituminous Roadways, Inc. <br />Asphalt Surface Technologies Corp. <br />F <br />OMG Midwest Inc. dba Minnesota Paving & Materials <br />C.S. McCrossan Construction, Inc. <br />Engineer's Estimate <br />$563,416.59 <br />$613,342.82 <br />$630,069.10 <br />$680,899.96 <br />$696,019.20 <br />$728,864.00 <br />$606, 764.60 <br />The bid of North Valley, Inc. of Nowthen, Minnesota, in the amount of $563,416.59 for the total bid for <br />construction of said improvements in accordance with the approved plans and specifications and advertisement for <br />bids, is the lowest responsible bidder. Adding indirect costs in the amount of 14-percent brings total project costs to <br />$642,294.91. <br />Per the final plans and specifications, estimated construction costs were $606,764.60. After adding 14-percent for <br />indirect costs including; administrative, engineering, finance and legal costs, estimated project costs totaled <br />$691,711.64. <br />The low bid is 7% less than the engineer's estimate, primarily due to lower than anticipated bituminous paving <br />pricing. <br />Funding sources for these improvements includes a mix of Pavement Management Funds, and Stormwater Utility <br />Funds. <br />• Pavement Management Funds $623,805.96 <br />• Stormwater Utility Funds $18,488.95 <br />• Total Project Costs $642,294.91 <br />Bolton & Menk proposes to provide construction staking in a total not -to -exceed amount of $1,560.00. These costs <br />are included in the 14% indirect costs. Staff feels these costs are reasonable on the scope of the proposed <br />improvements and required staking and recommends accepting the proposal, which is attached for reference. <br />City Staff proposes to administer and inspect construction. <br />Plans and specifications were prepared in-house as part of Staff's normal duties. <br />Recommendation: <br />