Laserfiche WebLink
DoeuSign Envelope ID: DFDAD95A-42A1-4402-86C7-97CBFEE125EA <br />INVOICE <br />INVOICE TOTAL: <br />1 A Special Inspections <br />Retainage <br />1 B Survey <br />Retainage <br />3A Concrete <br />Retainage <br />4A Masonry <br />Retainage <br />6A Carpentry Materials and install <br />Retainage <br />7B Architectural Metal Panels <br />Retainage <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />8A Doors, Frames, and Hardware - Materials <br />Retainage 1,685,059.19@ <br />8D Sectional Overhead Doors <br />Retainage 1,685,059.19@ <br />8E Aluminum Framed Storefronts & Entrances <br />Retainage 1,685,059.19@ <br />9A Gypsum Board Assemblies <br />Retainage 1,685,059.19@. <br />9E Painting <br />Retainage <br />I I B Vehicle Fueling System <br />Retainage <br />12B Casework Materials <br />Retainage <br />14A Vehicle Lifts <br />Retainage <br />21A Fire Supression Systems <br />Retainage <br />22A Plumbing Systems <br />Retainage <br />23A HVAC Systems <br />Retainage <br />26A Electrical Systems <br />Retainage <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />1,685,059.19@ <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />5.00% <br />1,685,059.06 <br />0.00 <br />3,440.25 <br />(172.01) <br />168,552.00 <br />(8,427.60) <br />42,331.00 <br />(2,116.55) <br />27,610.25 <br />(1,380.52) <br />8,660.00 <br />(433.00) <br />36,095.00 <br />(1,804.76) <br />102,000.00 <br />(5,100.00) <br />46,157.00 <br />(2,307.85) <br />76,023.89 <br />(3,801.20) <br />25,000.00 <br />(1,250.00) <br />49,471.18 <br />(2,473.55) <br />10,000.00 <br />(500.00) <br />74,865.29 <br />(3,743.26) <br />33,589.05 <br />(1,679.46) <br />79,591.00 <br />(3,979.55) <br />193,945.10 <br />(9,697.25) <br />165,572.04 <br />(8,278.60) <br />31A Earthwork 97,612.00 <br />