Laserfiche WebLink
❑ocuSign Envelope ID: DFDAD95A-42A1-4402-86C7-97CBFEE125EA <br />INVOICE <br />Retainage 1,685,059.19@ 5.00% (4,880.60) <br />32A Asphalt Paving 318,455.70 <br />Retainage l,685,059.19@ 5.00% (15,922.79) <br />32B Site Concrete 14,692.88 <br />Retainage 1,685,059.19@ 5.00% (734.64) <br />32D Landscaping 4,755.60 <br />Retainage 1,685,059.19@ 5.00% (237.78) <br />01-00 General Conditions & Requirements 86,506.75 <br />Retainage 1,685,059.19 5.00% (4,325.34) <br />99-99 Contractors Fee 20,1 33.08 <br />Retainage 1,685,059.19@ 5.00% (1,006.65) <br />CURRENT DUE : 1,600,806.10 <br />