My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 08/10/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:05:41 PM
Creation date
9/17/2021 1:42:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION: The City of Ramsey (City) is requesting proposals for the delivery of three <br />(3) geotechnical reports for 2022 projects including; <br />1. IP 22-01 Sunwood Drive and Waco Street Reconstruction <br />a. Sunwood Drive between Trunk Highway 47 and Waco Street <br />b. Waco Street between Sunwood Drive and 150th Avenue <br />c. Streets are approximately 0.48 miles in total length <br />i. 46-feet wide, with concrete curb and gutter <br />ii. Speed limit is 30 mph <br />d. Scope of work includes: <br />i. 6 soil borings to a depth of 15-feet per the attached exhibit <br />ii. A standard geotechnical report including construction feasibility for public <br />utilities and pavement section <br />iii. Logs of soil borings with descriptions of nomenclature used for defining the <br />site soils <br />iv. Estimated subgrade support strength parameters for design of the <br />bituminous roadway and recommendations for soil corrections <br />v. Recommendations for earthwork associated with installation of storm <br />sewer, sanitary sewer, and watermain <br />vi. Recommendations for management of groundwater for design of structures <br />and pavements <br />2. IP 22-02 Autumn Heights Street Reconstructions <br />a. Subdivision located on both sides of Armstrong Boulevard (CSAH 83) <br />i. Connections to Armstrong Boulevard at 167th Lane and Rabbit Street <br />b. Streets are approximately 1.61 miles in total length <br />i. 24-feet wide, rural section <br />ii. Speed limit is 30 mph <br />c. Scope of work includes: <br />i. 31 soil borings to a depth of 10-feet per the attached exhibit <br />ii. A standard geotechnical report including construction feasibility for public <br />utilities and pavement section <br />iii. Logs of soil borings with descriptions of nomenclature used for defining the <br />site soils <br />iv. Estimated subgrade support strength parameters for design of the <br />bituminous roadway and recommendations for soil corrections <br />v. Recommendations for earthwork associated with installation of storm sewer <br />vi. Recommendations for management of groundwater for design of structures <br />and pavements <br />Revised 7/21/21 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.