My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/10/2021
Ramsey
>
Public
>
Agendas
>
Council
>
2021
>
Agenda - Council - 08/10/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 3:05:41 PM
Creation date
9/17/2021 1:42:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/10/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
329
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. IP 22-06 Wood Pond Hills 2nd — 5th Street Reconstructions <br />a. Subdivision located generally southwest of Sunwood Drive and Nowthen <br />Boulevard (CSAH 5) <br />b. Streets are approximately 0.88 miles in total length <br />i. 31-feet wide, with concrete curb and gutter <br />ii. Speed limit is 30 mph <br />c. Scope of work includes: <br />i. 13 soil borings to a depth of 15-feet per the attached exhibit <br />ii. A standard geotechnical report including construction feasibility for public <br />utilities and pavement section <br />iii. Logs of soil borings with descriptions of nomenclature used for defining the <br />site soils <br />iv. Estimated subgrade support strength parameters for design of the <br />bituminous roadway and recommendations for soil corrections <br />v. Recommendations for earthwork associated with installation of storm <br />sewer, sanitary sewer, and watermain <br />vi. Recommendations for management of groundwater for design of structures <br />and pavements <br />SOIL BORING REQUIREMENTS: Soil borings to a depth called out above will be taken at <br />stationing shown on the attached "Boring Hole Location" exhibits. Soil borings will alternate <br />between drive lanes as practical. Cores of the existing bituminous pavement will be required. Cores <br />will be taken to verify thickness and structural integrity of the existing pavement and base. Pictures <br />of the cores will be included in the final report. Any additional depth beyond depth called out will <br />be paid per lineal foot. The Contractor must perform sufficient survey work to locate holes <br />approximately 5 feet horizontally and approximately 0.5 feet vertically. The Contractor is <br />responsible for locating all utilities prior to starting boring operations. <br />SOIL BORING LOG REQUIREMENTS: A field boring log will be prepared by the Contractor <br />for each boring with a copy included in the final report. The field boring logs will include; <br />• The project identification number <br />• Location of the boring referenced by centerline stationing <br />• Boring log number <br />• Method of drilling and sampling, diameter of bore hole <br />• Date, name of driller and crew <br />• Ground surface elevation and ground water elevation measured to the nearest 0.5 feet <br />• Definition of all symbols that are not otherwise self-explanatory <br />• Classification, thickness, color, moisture condition (dry, moist, wet, saturated), <br />composition and degree of compactness <br />• Field number of any samples taken, type of sample and depth taken <br />• Depth at which obstacles were encountered in advancing the boring <br />• Any other unusual conditions encountered during drilling and sampling <br />Revised 7/21/21 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.