Laserfiche WebLink
WORK AND STAGGING AREAS: The Contractor shall confine their work activities within <br />City owned properties and right of way. No equipment shall be left on City streets outside normal <br />working hours. <br />SPECIFICATIONS: Work shall be conducted in conformance with the specifications set forth <br />herein and in accordance with the latest edition of the Minnesota Department of Transportation <br />Standard Specifications for Construction which is incorporated by reference to these <br />specifications. <br />TRAFFIC CONTROL: All traffic control devices and layouts shall conform and be installed in <br />accordance to the latest addition of the Minnesota Temporary Traffic Control Field Manual. <br />PAYMENT: Payment will be made upon submittal of an invoice to the City on a net 30 day basis <br />following City acceptance of the work. An IC 134 form will be required prior to final payment. <br />BASIS OF AWARD: The City will award each individual project to the lowest proposal, rather <br />than the lowest combined total of all three proposals. <br />BASIS OF PAYMENT: Payment shall be made for the work on the basis specified below. The <br />cost of any additional labor, materials, permits, tools and supplies which have not been specifically <br />identified in this section for payment, but required to complete the project as per the plans and <br />specifications shall be considered incidental to the project. <br />Mobilization — Payment shall be made on a lump sum basis for the mobilization of equipment. <br />Geotechnical Report — Payment shall be made on a lump sum basis as compensation for all <br />development of the geotechnical report meeting the requirements outlined in this RFP. <br />Soil Boring — Payment shall be made on a per each basis as compensation for all equipment, <br />material and labor costs required for the soil boring and all required documentation of soil borings <br />as outlined in this RFP. <br />Soil Boring Additional Depth — Payment shall be made on a per lineal foot basis as compensation <br />for all equipment, material and labor costs required for soil boring at depth beyond depth as stated <br />in the introduction. The cost of meeting any Minnesota Department of Health requirement for <br />abandonment of geotechnical soil bore holes, including holes deeper than 15-feet are incidental to <br />this pay item. <br />Traffic Control — Payment shall be made on a lump sum basis as compensation for all equipment, <br />material, and labor costs required for the installation and maintenance of traffic control measures <br />(signage, barricades, flashers, flaggers, etc.), as directed by the Engineer, for any local traffic <br />disruptions or temporary closures. <br />Revised 7/21/21 5 <br />