Laserfiche WebLink
PROPOSAL <br />This proposal is submitted to the City of Ramsey for Pavement Management Program 2022 <br />Projects Geotechnical Reports. That accepts the terms and <br />conditions herein and agrees to deliver the final Geotechnical Reports to the City by Friday, <br />October 1, 2021, and to complete all work described herein for the following unit prices: <br />IP 22-01 SUNWOOD DRIVE AND WACO STREET RECONSTRUCTION <br />Item Item Description Unit Quantity Price Extension <br />No. <br />1 Mobilization LS 1 <br />2 Geotechnical Report LS 1 <br />3 Soil Boring EA 6 <br />4 Soil Boring Additional Depth LF 1 <br />Beyond 15-feet <br />5 Traffic Control LS 1 <br />Total Proposal Lines 1-5 <br />IP 22-02 AUTUMN HEIGHTS STREET RECONSTRUCTIONS <br />Item Description Unit Quantity Price Extension <br />Mobilization LS 1 <br />Geotechnical Report LS 1 <br />Soil Boring EA 31 <br />Soil Boring Additional Depth LF 1 <br />Beyond 10-feet <br />Traffic Control LS 1 <br />Total Proposal Lines 1-5 <br />IP 22-01 SUNWOOD DRIVE AND WACO STREET RECONSTRUCTION <br />Item Description Unit Quantity Price Extension <br />Mobilization LS 1 <br />Geotechnical Report LS 1 <br />Soil Boring EA 13 <br />Soil Boring Additional Depth LF 1 <br />Beyond 15-feet <br />Traffic Control LS 1 <br />Total Proposal Lines 1-5 <br />Revised 7/21/21 6 <br />